My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOUSE
>
0
>
2900 - Site Mitigation Program
>
PR0523853
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 9:21:06 AM
Creation date
2/6/2020 8:24:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523853
PE
2965
FACILITY_ID
FA0012794
FACILITY_NAME
STOCKTON PORT DISTRICT
STREET_NUMBER
0
Direction
W
STREET_NAME
HOUSE
STREET_TYPE
RD
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
W HOUSE RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Civic Center Square - • <br /> 2444 Main Street, Suite 215 f <br /> Fresno, California 93721-2734 <br /> (559] 264-2535 . FAX(559) 264-7431k ��ibt�, GEOM�i,TRUX <br /> iT <br /> May 10, 2002 <br /> Proposal 006988.PRO 02 OCT _1 AM 8: 39 <br /> Mr.J. Gordon Palmer, Jr. <br /> Deputy Port Director <br /> Port of Stockton <br /> Post Office Box 2089 <br /> Stockton, California 95203 <br /> Subject: Revised Work Plan to Evaluate Suitability of <br /> Roberts Island for Dredge Material Placement <br /> Port of Stockton, Stockton, California <br /> Dear Mr. Palmer: <br /> In response to your May 3, 2002, letter, Geomatrix Consultants, Inc. (Geomatrix), is pleased <br /> to provide the attached revised work plan to evaluate the suitability of the Roberts Island site <br /> for placement of dredge materials. The scope of the work plan has been revised as you <br /> indicated in your May 3, 2002, letter regarding the work plan submitted on February 21, 2002. <br /> As you indicated,in your letter, we have reduced the scope of Task 7 to include only two <br /> meetings and limit the reporting to a brief summary of findings,recommendations, and <br /> possible mitigation measures. If additional meetings are required, we can bill that time on a <br /> time-and-materials basis. These services described herein will be provided in accordance with <br /> the general consulting services agreement(Agreement) between Geomatrix and the Port of <br /> Stockton dated March 24, 2000, and the attached Addendum#3 to.the Agreement. Philip <br /> Ross will be the Geomatrix project manager and primary contact for these services. Our <br /> charges will be based upon pre-authorized total costs for our services as outlined in <br /> Addendum#3 and the work plan, which will not be exceeded without your additional <br /> authorization. <br /> Two copies of this letter and the attachments are enclosed. If you are in agreement with the <br /> scope and costs outlined in Addendum#3 and the work plan,please sign Addendum#3 and <br /> return it to us. <br /> Sincerely yours, <br /> GEO RIX TANTS, INC. <br /> Philip . Ross, R.G. Paul C. Deutsch, CPSS <br /> Senior Hydrogeologist Principal Soil Scientist <br /> Attachments: Work Plan <br /> Addendum#3 <br /> 2002 Schedule of Charges and Conditions <br /> Gezmatrix Consultants, Inc. <br /> Engineers, Geologists, and Environmental Scientists <br /> I:\PROJECn6OOOsX6988.000\6988-10.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.