Laserfiche WebLink
Focused Groundwater Investigation Work Plan <br /> Deuel Vocational Institution(DVI), Tracy, California Data Acquisition and Quality Assurance/Quality Control <br /> 5.7 Data Quality Management <br /> 5.7.1 Data Handling Systems <br /> The following sections describe the process for handling data in terms of data generation,review, and <br /> routing for field sampling data. The procedures identified in previous sections describe the recording of <br /> measurements on data collection forms. This section discusses the monitoring and controls established to <br /> track field data through field form completion,review, and correction. <br /> Field Form Completion <br /> Data collection procedures and field documentation will be recorded on field forms and the project field <br /> notebook. Examples of the field forms are provided in Appendix A. <br /> Field Review and Correction <br /> After completion of field data and analytical sampling paperwork, substantial efforts will be made to <br /> ensure that the recorded information is accurate, complete, and legible. Data review and correction <br /> protocols have been established for both field- and office-specific data collection and processing. <br /> Technical personnel will document and review their own work and be accountable for its correctness. The <br /> intent of the review is to ensure that all forms are completed, are legible, and possess the required data <br /> elements. <br /> Sample Shipment Paperwork <br /> Specific review considerations will be made for sample shipment paperwork. Before analytical samples <br /> are shipped from the field to the laboratory,the completed chain-of-custody paperwork will undergo <br /> thorough QC checks. First, a check will be performed by field personnel after all chain-of-custody forms <br /> and labels have been completed. Completion will include completing all necessary fields, except the <br /> chain-of-custody time relinquished field and having the sampler sign and date the form after completion <br /> of the review. The reviewer will ensure that the following is completed: <br /> • All forms and sample labels will be completed using a blue or black ballpoint pen. If an error is <br /> made on any form,the error will be struck with a single line,the correct value will be written as <br /> close to the old value as possible,and the correction will be initialed and dated. The incorrect <br /> value will not be written over or obliterated in any way. <br /> • If any sample shipment or paperwork errors occur,the errors will be corrected, signed, and dated. <br /> In addition to the above reviews,the designated reviewer also will evaluate the following: <br /> • adherence to the project schedule, <br /> • correct use of sample numbers, <br /> • correct types and numbers of sample bottles, <br /> • specification of preservation where necessary, <br /> • dates,times,and initials of corrections, and <br /> • correct chain-of-custody transfers between field personnel. <br /> 5-7 <br />