My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KENNEFICK
>
22150
>
2900 - Site Mitigation Program
>
PR0524723
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 1:46:06 PM
Creation date
2/6/2020 8:42:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524723
PE
2965
FACILITY_ID
FA0016603
FACILITY_NAME
MOKELUMNE RIM VINEYARDS
STREET_NUMBER
22150
Direction
N
STREET_NAME
KENNEFICK
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01715002
CURRENT_STATUS
01
SITE_LOCATION
22150 N KENNEFICK RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Regional Water Quality Control Boarda <br /> Central Valley Region <br /> Robert Schneider,Chair <br /> Terry Tamminen Arnold Schwarzenegger <br /> Secretaryfor Sacramento Main Office Governor <br /> Environmental Protection Internet Address: http://www.swrcb.ca.gov/—rwgcb5 <br /> 11020 Sun Center Drive,#200,Rancho Cordova,CA 95670-6114 <br /> Phone(916)464-3291 •FAX(916)4644780 <br /> ATTACHMENT D <br /> ITEMS TO BE INCLUDED IN A <br /> MONITORING WELL INSTALLATION WORKPLAN AND A <br /> MONITORING WELL INSTALLATION REPORT OF RESULTS <br /> Prior to installation of groundwater monitoring wells, the Discharger shall submit a workplan containing <br /> the minimum listed information. Wells may be installed after staff approve the workplan. Upon <br /> installation of the monitoring wells, the Discharger shall submit a report of results, as described below. <br /> All workplans and reports must be signed by a registered geologist, certified engineering geologist, or <br /> civil engineer registered or certified by the State of California. <br /> SECTION 1 - Monitoring Well Installation Workplan <br /> A. General Information: <br /> Purpose of well installation project <br /> Copies of County Well Construction Permits (to be submitted after workplan review) <br /> Monitoring well locations and rationale <br /> Survey details <br /> Equipment decontamination procedures <br /> Health and safety plan <br /> Topographic map showing any existing wells, proposed wells, waste handling facilities, <br /> utilities, and other major physical and man-made features. <br /> B. Drilling Details: <br /> Describe drilling technique <br /> Sampling intervals, and logging methods <br /> Cuttings storage and disposal <br /> C. Monitoring Well Design: <br /> Casing diameter and centralizer spacing (if needed) <br /> Borehole diameter <br /> Depth of surface seal <br /> Well construction materials <br /> Diagram of proposed well construction details <br /> Type of well cap, bottom cap either screw on or secured with stainless steel screws <br /> Size of perforations and rationale <br /> Grain size of sand pack and rationale <br /> Thickness and position of bentonite seal and sand pack <br /> Depth of well, length and position of perforated interval <br /> California Environmental Protection Agency <br /> Ca Recycled Paper <br /> The energy challenge facing California is real. Every Californian needs to take immediate action to reduce energy consumption. <br /> For a list of simple ways you can reduce demand and cut your energy costs,see our Web-site at http://www.swrcb.ca.gov/rwgcb5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.