Laserfiche WebLink
ATTACHMENT D <br /> - 2 - <br /> Monitoring Well Installation Workplan <br /> Monitoring Well Installation Report <br /> D. Well Development: <br /> Require a minimum of 48 hours prior to development activities <br /> Method of development to be used <br /> Method of determining when development is complete <br /> Parameters to be monitored during development <br /> Method of development water storage and disposal <br /> E. Well Survey: <br /> Identify the Licensed Land Surveyor or Civil Engineer that will perform the survey <br /> Describe what well features will be surveyed (i.e. top of casing, horizontal and vertical <br /> coordinates, etc.) <br /> Vertical accuracy shall be to at least 0.01 foot <br /> F. Soil Sampling (if applicable): <br /> Analyses to be run and methods <br /> Sample containers, collection method, and preservation method <br /> Table describing sample volumes, sample containers, preservation agents, and hold times <br /> Intervals at which soil samples are to be collected <br /> Number of soil samples to be analyzed and rationale <br /> Location of soil samples and rationale <br /> QA/QC procedures <br /> G. Well Sampling: <br /> Minimum time after development before sampling (48 hours) <br /> Well purging method and amount of purge water <br /> Sample containers, collection method, and preservation method <br /> Table describing sample volumes, sample containers, preservation agents, and hold times <br /> QA/QC procedures <br /> H. Water Level Measurement: <br /> The elevation reference point at each monitoring well shall be within 0.01 foot. Ground <br /> surface elevation at each monitoring well shall be within 0.01 foot. Method and time of water <br /> level measurement shall be specified. <br /> 1. Proposed time schedule for work. <br /> SECTION 2 —Groundwater Sampling and Analysis Plan <br /> A. General Information: <br /> Purpose of well sampling <br /> Site Location <br /> Monitoring well locations <br /> Monitoring well construction details including elevation, well depth, casing material and size, <br /> and screen interval <br /> Equipment decontamination procedures <br />