Laserfiche WebLink
ATTACHMENT D <br /> Monitoring Well Installation Workplan - 4 <br /> Monitoring Well Installation Report <br /> Depth to ground water <br /> Date of water level measurement <br /> Monitoring well number <br /> Date drilled <br /> Location <br /> B. Well Development: <br /> Date(s) of development of each well <br /> Method of development <br /> Volume of water purged from well <br /> How well development completion was determined <br /> Method of effluent disposal <br /> Field notes from well development should be included in report. <br /> C. Well Survey: <br /> Identify the coordinate system or reference points <br /> Survey the well casing will the cap removed (horizontal and vertical coordinates) <br /> Include the Registered Engineer or Licensed Surveyor's report and field notes in appendix <br /> Describe the measuring points (i.e. ground surface, top of casing, etc.) <br /> Present the well survey report data in a table <br /> D. Water Sampling: <br /> Date(s) of sampling <br /> How well was purged <br /> How many well volumes purged <br /> Levels of temperature, EC, and pH at stabilization <br /> Sample collection, handling, and preservation methods <br /> Sample identification <br /> Analytical methods used <br /> Laboratory analytical data sheets <br /> Water level elevation(s) <br /> Groundwater contour map <br /> E. Soil Sampling (if applicable): <br /> Date(s) of sampling <br /> Sample collection, handling, and preservation method <br /> Sample identification <br /> Analytical methods used <br /> Laboratory analytical data sheets <br />