My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KENNEFICK
>
22150
>
2900 - Site Mitigation Program
>
PR0524723
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 1:46:06 PM
Creation date
2/6/2020 8:42:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524723
PE
2965
FACILITY_ID
FA0016603
FACILITY_NAME
MOKELUMNE RIM VINEYARDS
STREET_NUMBER
22150
Direction
N
STREET_NAME
KENNEFICK
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01715002
CURRENT_STATUS
01
SITE_LOCATION
22150 N KENNEFICK RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT D - 3 - <br /> Monitoring Well Installation Workplan <br /> Monitoring Well Installation Report <br /> Health and safety plan <br /> Topographic map showing any existing wells, proposed wells, waste handling facilities, <br /> utilities, and other major physical and man-made features. <br /> B. Water Level Measurement: <br /> Ground surface elevation at each monitoring well shall be within 0.01 foot. <br /> Method and time of water level measurement shall be specified <br /> Water level in well shall be allowed to equilibrate prior to measuring the depth to water <br /> C. Well Sampling: <br /> Well purging method and amount of purge water, purge water storage <br /> Sample containers, collection method, and preservation method <br /> Table describing sample volumes, sample containers, preservation agents, and hold times <br /> Identification of analytical laboratory <br /> Chain of custody procedures <br /> QA/QC procedures <br /> D. Proposed time schedule for work. <br /> SECTION 3 - Monitoring Well Installation Report of Results <br /> A. Well Construction: <br /> Number and depth of wells drilled <br /> Date(s) wells drilled and completed <br /> Description of drilling and construction <br /> Locations relative to facility features such as buildings, storage ponds, waste piles, etc. <br /> A well construction diagram for each well must be included in the report, and should contain <br /> the following details: <br /> Drilling Contractor and driller name <br /> Depth of open hole (same as total depth drilled if no caving occurs) <br /> Method and materials of grouting excess borehole <br /> Footage of hole collapsed <br /> Length of slotted casing installed <br /> Depth of bottom of casing <br /> Depth to top of sand pack <br /> Thickness of sand pack <br /> Depth to top of bentonite seal <br /> Thickness of bentonite seal <br /> Thickness of concrete grout <br /> Boring diameter <br /> Casing diameter <br /> Casing material <br /> Size of perforations <br /> Number of bags of sand <br /> Well elevation at top of casing <br />
The URL can be used to link to this page
Your browser does not support the video tag.