Laserfiche WebLink
March 23,2006 <br /> NOA PROJECT NUMBER E05131A <br /> ' 3.5 Monitoring Well Installations <br /> Monitoring wells MW-1,MW-2 and MW-3 were constructed to a depth of 59', 595, and 60' feet bgs, <br /> respectively. <br /> Monitoring well MW-3 was constructed on March 13 and 14, 2006. Monitoring well MW-2 was <br /> constructed on March 15 and 16,2006. Monitoring well MW-1 was constructed on March 16 and 17, <br /> 2006. <br /> ' The monitoring well completion logs are presented on the borehole logs located in Appendix B. The <br /> monitoring wells were developed on March 20,2006 prior to sampling of the monitoring wells. <br /> ' 3.6 Monitoring Well Survey <br /> Well elevations and horizontal locations were determined by professional survey. The professional <br /> ' surveyor's letter of transmittal of survey results is included as Appendix D-Monitoring Well Survey. <br /> The top of PVC casing reference elevation for each well is included in the summary of well construction <br /> information(Table 1). Location and elevation information is also included on the boring logs for each <br /> ' well. The well locations shown in the site map (Appendix A-Plate 2)reflect the relative well positions <br /> as determined by professional survey. <br /> 5 '404 <br />