Laserfiche WebLink
California Reronal Water Quality Ctrol Board ~ ' <br /> Central Valley Region <br /> Robert Schneider,Chair <br /> Winston H.Hickox Gray Davis <br /> Secretaryfor Sacramento Main Office Governor <br /> Environmental Internet Address: http://www.swrcb.ca.gov/rwgcb5 <br /> Protection 3443 Routier Road,Suite A,Sacramento,California 95827-3003 <br /> Phone(916)255-3000•FAX(916)255-3015 <br /> 22 October 2001 <br /> Vickie Mello Marion Gonzales <br /> 24774 Ullrey PO Box 206 <br /> Escalon, CA 95320 Escalon, CA 95320 <br /> REQ UEST TO IMPLEMENT WORKPLAN AND SUBMIT FINAL REMEDIATION PLAN <br /> TONY GONZALES TRUCKING, 1855 JACKSONSTREET,ESCALON,SANJOAQUIN COUNTY <br /> In our 20 June 2001 letter,we approved the plan of work to install two vapor extraction wells and conduct a <br /> 5-day vapor extraction test as outlined in the 14 May 2001 Problem Assessment Report(PAR) submitted on your <br /> behalf by Ground Zero Analysis, Incorporated(Ground Zero). We requested that you complete soil vapor <br /> extraction (SVE)testing and submit the results by 1 October 2001 in a Final Remediation Plan (FRP). To date, <br /> the plan of work has not been implemented, and we have not received the requested FRP. <br /> Due to non-compliance with San Joaquin County Environmental Health Division(County) directives, the County <br /> referred this site to us in August 2000, and we issued our Water Code Section 13267 directive to you on <br /> 28 August 2000 requiring you to submit a plan of work to complete the soil and groundwater investigation <br /> relating to the former underground storage tanks (USTs) at the subject site. The initial workplan was submitted <br /> as required;however,you have not shown a good faith effort to continue this investigation. <br /> We recently received correspondence from the UST Cleanup Fund that the pre-approval request for the SVE <br /> testing and preparation of the FRP was submitted to them on 17 September 2001 (88 days following our <br /> workplan approval). Please note that site work is not stipulated on pre-approval and it is inappropriate to <br /> disregard regulatory deadlines while applying or waiting for pre-approval. <br /> You must complete the SVE testing forthwith and submit the required FRP. Please acknowledge this letter by <br /> submitting a schedule for work at your site. By 31 October 2001, submit a schedule to this office to install the <br /> necessary SVE wells,complete the SVE testing, analyze air samples, and submit the FRP. <br /> Failure to comply with these requests may subject you to formal enforcement actions including monetary civil <br /> liability, and may affect future reimbursements from the UST Cleanup Fund. Please notify me at least five <br /> business days prior to any ite work. If you have any questions or comments,please call me at(916)255-3115. <br /> a <br /> a . <br /> Ma Hart ell,R.G. <br /> Associate Engineering Geologist <br /> cc: Mr. Mark Owens, SWRCB,UST Cleanup Fund, Sacramento <br /> Ms. Lori Duncan, San Joaquin County Public Health Services, Stockton <br /> Mr. John Lane,Ground Zero Analysis, Incorporated,Escalon <br /> California Environmental Protection Agency <br /> tZ�Recycled Paper <br /> The energy challenge facing California is real. Every Californian needs to take immediate action to reduce energy consumption. <br /> For a list of simple ways you can reduce demand and cut your energy costs,see our Web-site at http://www.swrcb.ca.gov/rwgcb5 <br />