My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
1855
>
2900 - Site Mitigation Program
>
PR0527643
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 2:14:51 PM
Creation date
2/6/2020 9:00:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0527643
PE
2960
FACILITY_ID
FA0005232
FACILITY_NAME
TONY GONZALES TRUCKING INC
STREET_NUMBER
1855
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
APN
22715406
CURRENT_STATUS
02
SITE_LOCATION
1855 JACKSON AVE
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State Vmater Resources Contro~f Board <br /> Division of Clean Water Programs <br /> Winston H. Hiekox 2014 T Street•Sacramento,Califomia 95814•(916)227-4411 <br /> Secretary for Mailing Address: P.O.Box 944212•Sacramento,California•94244-2120 Gray Davis <br /> Environmental FAX(916)227-4530•Internet Address: http://www.swrcb.ca.gov/--Cwphome/ustct' Governor <br /> Protection <br /> Q <br /> ; <br /> Vickie Mello C— <br /> _ <br /> Tony&Marion Gonzales 1 <br /> P O Box 206 `7 <br /> Escalon, CA 95320 <br /> UNDERGROUND STORAGE TANK CLEANUP FUND PROGRAM, PROGRAM MANAGER..• <br /> DECISION FOR ELIGIBILITY DETERMINATION: CLAIM NUMBER 014796; FOR SITE x' <br /> ADDRESS: 1855 JACKSON AVE, ESCALON <br /> I have received your request for a Program Manager Decision. After review of the request and supporting <br /> arguments, I have decided to find in your favor and to accept the claim on the Priority List in Priority <br /> Class "C". <br /> We have completed our initial review. The next step in the claim review process is to conduct a <br /> compliance review. <br /> Compliance Review: Staff reviews, verifies, and processes claims based on the priority and rank within <br /> a priority class. After the Board adopts the Priority List,your claim will remain on the Priority List until <br /> your Priority Class and rank are reached. At that time, staff will conduct an extensive Compliance <br /> Review at the local regulatory agency or Regional Water Quality Control Board. During this Compliance <br /> Review, staff may request additional information needed to verify eligibility. Once the Compliance <br /> Review is completed, staff will determine if the claim is valid or must be rejected. If the claim is valid,a <br /> Letter of Commitment will be issued obligating funds toward the cleanup. If staff determine that you <br /> have not complied with regulations governing site cleanup,you have not supplied necessary information <br /> or documentation, or your claim application contains a material error, the claim will be rejected. In such <br /> event, you will be issued a Notice of Intended Removal from the Priority List, informed of the basis for <br /> the proposed removal of your claim, and provided an opportunity to correct the condition that is the basis <br /> for the proposed removal. Your claim will be barred from further participation in the Fund, if the claim <br /> application contains a material error resulting from fraud or intentional or negligent misrepresentation. <br /> Record keeping: During your cleanup project you should keep complete and well organized records of all <br /> corrective action activity and payment transactions. If you are eventually issued a Letter of Commitment, <br /> you will be required to submit: (1) copies of detailed invoices for all corrective action activity performed <br /> (including subcontractor invoices), (2)copies of canceled checks used to pay for work shown on the <br /> invoices, (3) copies of technical documents (bids,narrative work description, reports), and(4) evidence <br /> that the claimant paid for the work performed(not paid by another party). These documents are necessary <br /> for reimbursement and failure to submit them could impact the amount of reimbursement made by the <br /> Fund. It is not necessary to submit these documents at this time;however, they will definitely be <br /> required prior to reimbursement. <br /> Compliance with Corrective Action Requirements: In order to be reimbursed for your eligible costs of <br /> cleanup incurred after December 2, 1991,you must have complied with corrective action requirements of <br /> Article 11, Chapter 16, Division 3, Title 23, California Code of Regulations. Article 11 categorized the <br /> Ca/&forma En vironmental Protection Agencv <br /> �a RecycledP�per <br />
The URL can be used to link to this page
Your browser does not support the video tag.