Laserfiche WebLink
ADDITIONAL INFORMATION Imo,,ULBEMENTS-EXISTING SYSTEM / <br /> SUTTER HOME WINERY <br /> LODI,SAN JOAQUIN COUNTY <br /> 12) Allowing for two feet of freeboard,what is the approximate storage capacity of the wastewater <br /> ponds? Provide a water balance which evaluates the containment structures ability to provide <br /> sufficient capacity on a month by month basis. Include monthly evaporation,precipitation, <br /> and irrigation rates as well as monthly discharge volumes. Rainfall shall be based on the <br /> 100-year return period total annual precipitation. <br /> 13) Describe management provisions that will be implemented to prevent the occurrence of flies, <br /> mosquitoes, and odor nuisances and problems such as pond overflows (maintenance plans, <br /> standby pumps or generators, and contingency plans, etc.). <br /> 14) Describe the storage and disposal of all solid wastes generated in the winemaking process. <br /> Include a description of operation and maintenance procedures that prevent odor complaints, <br /> fly breeding, or other nuisance condition. <br /> 15) If land disposal of wastewater is contemplated, present loading rates for BOD (in <br /> lbs/acre/day), total nitrogen (in lbs/acre/year), and salts (in lbs/acre/year). Provide a <br /> description of the disposal area and the disposal technique. State the number of acres of land <br /> used for disposal and crops planned for application areas (show locations of land on map). <br /> Describe harvesting and crop disposal procedures. Describe the mixing ratio of wastewater <br /> and supplemental irrigation water prior to application, and describe the tailwater control and <br /> return system. (Note: Discharge of wastewater to fallow land is not an acceptable method of <br /> disposal). <br /> 16) Provide information sufficient to determine whether this discharge of wastewater will <br /> adversely impact underlying groundwater. <br /> 17) Before the Board can adopt WDRs for this discharge, the requirements of the California <br /> Environmental Quality Act (CEQA) must be complied with. Provide the County CEQA <br /> document for this facility. <br />