My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACOB BRACK
>
18667
>
2900 - Site Mitigation Program
>
PR0528324
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 3:08:06 PM
Creation date
2/6/2020 9:11:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0528324
PE
2965
FACILITY_ID
FA0019131
FACILITY_NAME
SUTTER HOME LODI WINERY
STREET_NUMBER
18667
STREET_NAME
JACOB BRACK
STREET_TYPE
RD
City
LODI
Zip
95242
APN
01109014
CURRENT_STATUS
01
SITE_LOCATION
18667 JACOB BRACK RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDITIONAL I)WORMATION REQUIREMENTS—AkSE I SYSTEM <br /> SUTTER HOME WINERY <br /> LODI, SAN JOAQUIN COUNTY <br /> 1) Describe the prevailing wind directions, and nearby industrial or populated areas. Provide <br /> information on the previous land use. <br /> 2) Do active or abandoned industrial, agricultural, domestic, or groundwater wells exist on the <br /> property or the wastewater disposal area(s)? If yes, provide a map showing their location(s). <br /> Include available data on the depth of groundwater and information on aquifers and aquitards <br /> identified beneath the property. <br /> 3) Describe any ion exchange (water softening),reverse osmosis, or other treatment process for <br /> the supply water. Describe the disposal of any regeneration brine or reverse osmosis reject <br /> water. Provide a description of the process supply wastewater; at a minimum, the process <br /> supply water should be characterized for the following analytical parameters: nitrate, total <br /> Kjeldahl nitrogen, total dissolved solids, and pH. <br /> 4) Provide a list of chemicals which are used in the winemaking processes, include all chemicals <br /> used in tank, bottle, or other cleaning. Describe the sources of hot water used in the winery. <br /> 5) Describe the storage and disposal of stormwater. Describe the proposed criteria for switching <br /> the discharge between the stormwater pond and the wastewater ponds and activities that will <br /> be performed to purge the wastewater sumps of industrial wastewater prior to diverting <br /> stormwater to the stormwater ponds. Describe how the criteria is protective of shallow <br /> groundwater quality, especially at the stormwater pond. <br /> 6) Describe the domestic wastewater system. The description shall include the number of users, <br /> location, flow rate, septic tank size, and construction materials. <br /> 7) Provide the September 1998, Condor Earth Technologies percolation test report referenced in <br /> the Irrigation and Effluent Application Rates table. Provide the well installation report and <br /> groundwater data for the domestic wastewater mound system. <br /> 8) Provide diagrams of surface impoundments that will be used to store wastewater or ion <br /> exchange regeneration brine,provide diagrams and a description of the planned impoundment, <br /> location, size and depth, construction materials, inlet and outlets, depth to groundwater below <br /> the bottom of the pond, and existing or planned groundwater monitoring wells. <br /> 9) Provide descriptions of all assumptions and sources of data for the water balance which <br /> evaluates the containment structures ability to provide sufficient capacity on a month by <br /> month basis. Include monthly evaporation, precipitation, and irrigation rates as well as <br /> monthly discharge volumes. Rainfall shall be based on the 100-year return period total annual <br /> precipitation. Describe all assumptions employed regarding stormwater runoff from the tank <br /> farm areas or other industrial process areas. <br /> 10) Describe the management of the wastewater facilities that are located within the 100-year <br /> flood zone. <br /> 11) Describe measures that will be implemented to prevent groundwater from floating and <br /> damaging the pond liners. <br /> 12) Describe management provisions that will be implemented to prevent the occurrence of flies, <br /> mosquitoes, and odor nuisances and problems such as pond overflows (maintenance plans, <br /> standby pumps or generators, and contingency plans, etc.). <br />
The URL can be used to link to this page
Your browser does not support the video tag.