Laserfiche WebLink
Kennedy/Jenks Consukants <br /> will be distributed on the ground near each work site. Water residuals will be distributed on the <br /> ground near each well site in a manner that does not affect site safety. <br /> 3.8 Quality Assurance/Quality Control Procedures <br /> Field QA/QC will include collection of one field duplicate sample during each sampling event. <br /> The results of the duplicate sample will be compared to the primary sample for consistency. The <br /> laboratory will follow its standard internal QA/QC procedures during sample analysis, including <br /> elements such as analyzing method blanks and control spikes, where appropriate. <br /> Analytical data received from the laboratory will be reviewed immediately upon receipt for <br /> completeness and consistency. Any discrepancies will be discussed with the laboratory and <br /> corrective measures will be taken if warranted. <br /> Monitoring Well Replacement Work Plan Page 7 <br /> Sutter Home Winery, Lodi, California <br /> s`�wowuamm4� eesoos.is.m.n�.wwwamMw M, I"y Ado <br />