Laserfiche WebLink
Kennedy/Jenks Consultants <br /> Section 4: Monitoring Well Installation Report <br /> A Monitoring Well Replacement Report(Report) will be prepared and submitted to the Water <br /> Board following completion of the field activities and receipt of the analytical laboratory results. It <br /> is anticipated that the Report will include the following: <br /> • Well destruction and well installation details, including soil boring logs and a narrative of field <br /> activities. <br /> • Description of geologic/hydrogeologic conditions encountered during monitoring well <br /> installation. <br /> • Well construction details. <br /> • Well development information. <br /> • Well survey. <br /> • Topographic site map showing facilities, well locations, and other major physical and <br /> man-made features. <br /> The Report will conclude with an evaluation of the data collected and, if needed, recommended <br /> additional field activities. The Report will be prepared under the supervision of a professional <br /> geologist or engineer, registered in the state of California. <br /> Monitoring Well Replacement Work Plan Page 8 <br /> Sutter Home Winery, Lodi, California <br /> p'.1is9rouplaOminljoblOB`DBfi5005.15_sutlerbomaW9reportsMwinstall wplteattla <br />