Laserfiche WebLink
Kennedy/Jenks Consultants <br /> rig-mounted hammer. Record the standard penetration resistance. If the sample is pushed <br /> rather than driven, be sure to record the push farce. <br /> 7. Have the soils classified in the field in approximate accordance with the visual-manual <br /> procedure of the Unified Soil Classification System (ASTM D-2488-90) and the Munsell Color <br /> Classification. <br /> 1.4 Equipment Cleaning <br /> 1. Prior to drilling each boring, steamclean downhole equipment(augers, well casing, sampler). <br /> 2. Before collection of each drilling sample, wash sampling equipment (sampler and brass liners) <br /> with a brush, in a solution of high purity phosphate-free soap and potable water. Rinse the <br /> equipment with potable water. <br /> 3. Before leaving the site at completion of drilling, steamclean downhole equipment and vehicles <br /> that require cleaning. <br /> 1.5 Investigation-Derived Residuals <br /> Place soil cuttings and other residuals on the soil near the well for spreading or removal by the <br /> client. Steam cleaning residuals will be distributed on the ground near the well, in such a way that <br /> does not generate a safety hazard. <br /> Monitoring Well Replacement Work Plan, SOG 1 <br /> Sutter Home Lodi Winery, Lodi, California Page 2 of 2 <br /> g:tiagraupaEminyoE`DB19885005.15_wtlerliome149+epMSMwinstall wpla,b_.p11 da <br />