Laserfiche WebLink
LKennedy/Jenks Consultants <br /> Section 5: Monitoring Well Installation Report <br /> L A Monitoring Well Installation Report (Report) will be prepared and submitted to the CRWQCB <br /> following completion of the field activities and receipt of the analytical laboratory results. It is <br /> anticipated that the Report will include the following: <br /> 4 • Drilling details, including soil boring logs and a narrative of field activities. <br /> 4 • Description of geologic/hydrogeologic conditions encountered during monitoring well <br /> installation. <br /> • Well construction details. <br /> • Well development information. <br /> L • Well survey. <br /> • Topographic site map showing facilities, well locations, and other major physical and <br /> man-made features. <br /> The Report will conclude with an evaluation of the data collected and, if needed, recommended <br /> additional field activities. The Report will be prepared under the supervision of a professional <br /> geologist or engineer, registered in the state of California. <br /> �f <br /> 4 <br /> Ir <br /> L Monitoring Well Installation Work Plan Page 13 <br /> Sutter Home Winery, Lodi, California <br /> g YsgrpupWmjopWNMS.13,vNkrhome109rep�-WpV Adm <br />