Laserfiche WebLink
Spill Prevention Compliance Corporation '8a <br /> z Periodic Integrity Test Certificate g <br /> P.O. Box 1289........Waterford, CA 95386 Telephone: (209) 969-0851 <br /> m <br /> Email: soccoroCmhotmaiLcom <br /> m <br /> m - N o <br /> ,' ClieotBrown Sand and Gravel Contact Person: Timothy Clement, Shot/ Mar � N <br /> Address 800Mossdale Road Telephone: (209) 321-0046 N o <br /> d City/State/Zip Lathrop. CA 95330 <br /> m Location of Tank(s) if different from Client Address—Shop Area m <br /> Q — o > <br /> Tank Info (brand/product stored/gals/UL#)unbranded UST/aggrox 8000 salt m <br /> UL# <br /> Description of Secondary Containment Ogen metallic dike m^ <br /> Date of Test 4/20/17& 6/19/17 'I'estSupervisor(s) Matt/PaulMcWhorter $ <br /> METHOD OF PERIODIC INTEGRITY TEST-Primary__X— Secondary—X- <br /> 1. <br /> econdaryX1. Steel Thickness Test (in accordance with API-653 and/or STI P001 (5'" edition)- c <br /> readings(instrumentationTM-8810 ultrasonic microprocessor: m' <br /> minimum end/wall thickness()minimum bottom/wall thickness & <br /> corrosion-circle one(significant or nominal)...pitting-circle one (significant or nominal) m <br /> Coating required (explain) <br /> Detailed wall thickness readings are held in the SPC Corp client-file(total readings_) <br /> 2. Nitrogen Blanket_Y_N (document psi readings) Duration <br /> 3. CO2 Blanket_Y_N (document psi readings) Duration <br /> 4. Tracer Gas_Y N (document inert gas used) Duration_ 3 <br /> Tracer Gas compatibility factors (describe) m <br /> 5. Pressure-Test_Y_N (document psi readings) Duration c <br /> 6. Vacuum Test_Y_N (document inches of Mercury readings_ Duration f <br /> 7. Sonar-Test_Y_N (document db readings) Duration <br /> 8. Camera(visual) model Lorex MC81845/interstidal X Y_N (findings)fuel in annulus <br /> 9. Hydro-Carbon Sensor(probe) model OMNTEC BOA-PDS X Y N fuel in annulus x <br /> 10. Hydrology (Water Column) <br /> _Y_N (document inches of water column <br /> readings) Duration <br /> TEST RESULTS m <br /> I"-Stage: o <br /> Pass X Fail_(quantify)6/19/17-camera confirms no fuel in interstice (corrective action) m <br /> 2"-Stage: <br /> Pass X Fail_ (quantify) 6/19/17-sensor confirms no fuel in interstice (corrective ) 8 <br /> Comments sectiona <br /> IPF <br /> Next Scheduled Periodic Integrity TestIf primary/secondary containment passes test, schedule next periodic integrity test nolater than 3 years from date of initial test Date of Next ScheduledTest > <br /> (Certificate)SPC Corp Representative <br />