Laserfiche WebLink
Brown Sand,Inc. <br /> Spill Prevention, Control, and Countermeasures Plan Page: 4 <br /> June 3, 2020 <br /> 1.3 Location of SPCC Plan (40 CFR 112.3(e)) <br /> As required by 40 CFR 112.3(e), a copy of this SPCC plan is maintained at the facility in <br /> the main office and in the maintenance shop. The facility is open during business hours <br /> from 8:00am to 5:00pm Monday thru Friday, excluding holidays. <br /> 1.4 Plan Review (40 CFR 112.3 and 112.5) <br /> 1.4.1 Changes in Facility Configurations <br /> In accordance with 40 CFR 112.5(a), Brown Sand, Inc. periodically reviews and <br /> evaluates this SPCC Plan for any changes in the facility design, construction, <br /> operation, or maintenance that materially affects the facility's potential for oil <br /> discharge, including but not limited to: <br /> • Commissioning of Containers <br /> • Replacement, reconstruction, or installation of piping systems <br /> • Construction or demolition that might alter secondary containment <br /> structures. <br /> • Changes of product or service,revisions to standard operation,modification <br /> of testing/inspection procedures, and use of new or modified industry <br /> standards or maintenance procedures. <br /> Amendments to the SPCC Plan made to address changes of this nature are referred <br /> to as technical amendments, and must be certified by a PE. Non-technical <br /> amendments can be done (and must be documented in this section) by the facility <br /> owner and/or operator. Non-technical amendments include the following: <br /> • Changes in the name or contact information (i.e. telephone numbers) of <br /> individuals responsible for the implementation of this Plan; or <br /> • Change in the name or contact information of spill response or cleanup <br /> contractors. <br /> Brown Sand, Inc. will make any revisions to the SPCC Plan within six (6) months <br /> after the changes occur. The SPCC Plan will also be updated as soon as possible <br /> following any technical amendments,but no later than six(6)months from the date <br /> of the amendments. The facility manager is responsible for initiating and <br /> coordinating revisions to the SPCC Plan. <br />