My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOSSDALE
>
800
>
2800 - Aboveground Petroleum Storage Program
>
PR0515783
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2020 3:48:22 PM
Creation date
2/6/2020 9:13:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0515783
PE
2832
FACILITY_ID
FA0010944
FACILITY_NAME
BROWN SAND INC
STREET_NUMBER
800
Direction
W
STREET_NAME
MOSSDALE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
23903008
CURRENT_STATUS
01
SITE_LOCATION
800 W MOSSDALE AVE
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brown Sand,Inc. <br /> Spill Prevention, Control, and Countermeasures Plan Page: 4 <br /> June 3, 2020 <br /> 1.3 Location of SPCC Plan (40 CFR 112.3(e)) <br /> As required by 40 CFR 112.3(e), a copy of this SPCC plan is maintained at the facility in <br /> the main office and in the maintenance shop. The facility is open during business hours <br /> from 8:00am to 5:00pm Monday thru Friday, excluding holidays. <br /> 1.4 Plan Review (40 CFR 112.3 and 112.5) <br /> 1.4.1 Changes in Facility Configurations <br /> In accordance with 40 CFR 112.5(a), Brown Sand, Inc. periodically reviews and <br /> evaluates this SPCC Plan for any changes in the facility design, construction, <br /> operation, or maintenance that materially affects the facility's potential for oil <br /> discharge, including but not limited to: <br /> • Commissioning of Containers <br /> • Replacement, reconstruction, or installation of piping systems <br /> • Construction or demolition that might alter secondary containment <br /> structures. <br /> • Changes of product or service,revisions to standard operation,modification <br /> of testing/inspection procedures, and use of new or modified industry <br /> standards or maintenance procedures. <br /> Amendments to the SPCC Plan made to address changes of this nature are referred <br /> to as technical amendments, and must be certified by a PE. Non-technical <br /> amendments can be done (and must be documented in this section) by the facility <br /> owner and/or operator. Non-technical amendments include the following: <br /> • Changes in the name or contact information (i.e. telephone numbers) of <br /> individuals responsible for the implementation of this Plan; or <br /> • Change in the name or contact information of spill response or cleanup <br /> contractors. <br /> Brown Sand, Inc. will make any revisions to the SPCC Plan within six (6) months <br /> after the changes occur. The SPCC Plan will also be updated as soon as possible <br /> following any technical amendments,but no later than six(6)months from the date <br /> of the amendments. The facility manager is responsible for initiating and <br /> coordinating revisions to the SPCC Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.