Laserfiche WebLink
Brown Sand,Inc. <br /> Spill Prevention, Control, and Countermeasures Plan Page: 5 <br /> June 3, 2020 <br /> 1.4.2 Schedule Plan Review <br /> In accordance with 40 CFR 112.5(b), Brown Sand, Inc. reviews this SPCC Plan at <br /> least once every five (5) years. Revisions to the Plan, if needed, are made within <br /> six (6) months of the five-year review (Appendix A). A registered Professional <br /> Engineer(PE) certifies any technical amendments to the Plan, as described above, <br /> in accordance with 40 CFR 112.3(d). <br /> 1.4.3 Record of Plan Reviews <br /> Schedule reviews and Plan amendments are recorded in the Compliance Inspection <br /> Plan Review Page (Appendix A). This log must be completed even if no <br /> amendment is made to the SPCC Plan as a result of the review. <br /> 1.5 Cross-Reference with SPCC Provisions (40 CFR 112.7) <br /> This SPCC plan does not follow the exact order presented in 40 CFR part 112. Section <br /> headings identify, where appropriate, the relevant section(s) of the SPCC rule. The table <br /> below presents the cross-reference of this SPCC Plan sections relative to applicable <br /> provisions of 40 CFR Part 112. <br />