Laserfiche WebLink
Brown Sand,Inc. <br /> Spill Prevention, Control, and Countermeasures Plan Page: 6 <br /> June 3, 2020 <br /> SPCC Cross-Reference <br /> Provision Plan Section Page <br /> 40 CFR 112.3(d) Section 1.2: Professional Engineer Certification 3 <br /> 40 CFR 112.3(e) Section 1.3: Location of SPCC Plan 4 <br /> 40 CFR 112.4 Section 4.7: Discharge Notification 31 <br /> 40 CFR 112.5 Section 1.4: Plan Review 4 <br /> 40 CFR 112.7 Section 1.1: Management Approval 2 <br /> 40 CFR 112.7 Section 1.5: Cross-Reference with SPCC Provisions 5 <br /> 40 CFR 112.7(a)(2) Section 3.1: Compliance with Applicable Requirements 10 <br /> Section 2.0: General Facility Information 7 <br /> 40 CFR 112.7(a)(3) Section 2.1: Facility Description 7 <br /> Section 3.2: Facility Layout Diagram 10 <br /> Fi re 3: Site Map 37 <br /> 40 CFR 112.7(a)(3)(i) Section 2.2: Facility Storage(40 CFR 112.7(a)(3)) 8 <br /> 40 CFR 112.7(a)(3)(ii) Section 3.0: Discharge Prevention(40 CFR 112.7) 9 <br /> 40 CFR 112.8(a)(3)(iii) Section 3.4.3: Drainage of Diked Areas(40 CFR 112.8(c)(3)) 12 <br /> 40 CFR 112.7(a)(3)(iv) Section 4.0: Discharge Response(40 CFR 112.7(a)(5)) 27 <br /> Section 4.7: Waste Disposal 31 <br /> 40 CFR 112.7(a)(4) Section 4.7:Discharge Notification 31 <br /> 40 CFR 112.7(a)(5) Section 4.0: Discharge Response 27 <br /> 40 CFR 112.7(b) Section 3.5:Potential Discharge Volumes and Direction of Flow 14 <br /> 40 CFR 112.7(c) Section 3.6: Drainage Control,Diversionary Structures,Containment 20 <br /> 40 CFR 112.7(d) Section 3.7: Practicability of Secondary Containment 20 <br /> 40 CFR 112.7(e) Section 3.8: Inspections/Record Keeping 20 <br /> 40 CFR 112.7(f) Section 3.10: Personal Training 24 <br /> 40 CFR 112.7(g) Section 3.9: Site Security 24 <br /> 40 CFR 112.7(h) Section 3.11: Tank Truck Loading/Unloading Rack Requirements 24 <br /> 40 CFR 112.7(i) Section 3.12: Brittle Fracture Evaluation 26 <br /> 40 CFR 112.70) Section 3.13: Confirmation with State and Local Applicable Requirements 26 <br /> 40 CFR 112.8(b) Section 2.3.2: Facility Drainage 9 <br /> 40 CFR 112.8(c) Section 3.4: Bulk Storage Containers 10 <br /> 40 CFR 112.8(c)(1) Section 3.4.1: Tank Construction 10 <br /> 40 CFR 112.8(c)(2) Section 3.4.2: Secondary Containment 11 <br /> 40 CFR 112.8(c)(3) Section 3.4.3: Drainage of Diked Areas 12 <br /> 40 CFR 112.8(c)(8) Section 3.4.5: Overfill Prevention Systems 13 <br /> 40 CFR 112.8(c)(10) Section 3.4.6: Visible Discharges 13 <br /> 40 CFR 112.8(c)(11) Section 3.4.7: Mobile and Portable Containers 13 <br /> 40 CFR 112.8(c)(4) Section 3.4.8: Corrosion Protection 13 <br /> 40 CFR 112.8(c)(5) Section 3.4.9: Partially Buried and Bunkered Storage Tanks 14 <br /> 40 CFR 112.8(c)(7) Section 3.4.10: Heating Coils 14 <br /> 40 CFR 112.8(c)(9) Section 3.4.11: Effluent Treatment Facilities 14 <br /> 40 CFR 112.8(d) Section 3.14: Transfer Operations,Pumping,and In-Plant Processes 26 <br />