My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_REVISED DRYWELL CLOSURE AND INVESTIGATION WORK PLAN
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
902
>
2900 - Site Mitigation Program
>
PR0538738
>
ARCHIVED REPORTS_REVISED DRYWELL CLOSURE AND INVESTIGATION WORK PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 10:09:11 AM
Creation date
2/6/2020 9:29:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
REVISED DRYWELL CLOSURE AND INVESTIGATION WORK PLAN
RECORD_ID
PR0538738
PE
2950
FACILITY_ID
FA0022243
FACILITY_NAME
NEIL O ANDERSON & ASSOC INC
STREET_NUMBER
902
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
902 INDUSTRIAL WAY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 18, 2014 <br /> HEALTH AND SAFETY PLAN <br /> NEIL O. ANDERSON &ASSOCIATES <br /> ' LODI, CALIFORNIA <br /> ' 1.0 INTRODUCTION <br /> 1.1 General Information <br /> Sampling will be conducted at the site by Neil O. Anderson and Associates, Inc (NOA) under the <br /> ' supervision of the San Joaquin Environmental Health Department. A sampling work plan has <br /> been prepared for the project. <br /> This Health and Safety Plan (HASP) specifies the procedures and protective measures that will <br /> be employed to ensure the health and safety of the individuals working in and around the site, <br /> and those who reside and/or work near the site. <br /> ' The purpose of this HASP is to provide site-specific safety information and procedures. Site- <br /> specific information and procedures contained herein include: a brief overview of site hazards, <br /> ' chemicals of concern, action levels, initial levels of personal protective equipment to be used for <br /> various site activities, decontamination procedures, air monitoring procedures, and emergency <br /> resources and information. <br /> '. The procedures in this document should be consistent with NOA's Health and Safety Policies. If <br /> there are any questions regarding possible inconsistencies please contact NOA. <br /> ' 1.2 Scope and Applicability of the Health and Safety Plan <br /> The provisions of this HASP are mandatory for all NOA personnel and subcontractors. <br /> Subcontractors doing fieldwork in association with the Work Plan either adopt and abide by this <br /> HASP or shall develop their own safety plans that, at a minimum, meet the requirements of this <br /> HASP. All on-site personnel shall read this plan before starting site activities. In addition, <br /> personnel will operate in accordance with the most current requirements of Title 8 California <br /> Code of Regulations, Section 5192 (T8 CCR Section 5192), Standards for Hazardous Waste <br /> Operations and Emergency Response(HAZWOPER). <br /> Onsite personnel are responsible for operating in accordance with all applicable regulations of <br /> the Division of Occupational Safety & Health (Cal/OSHA) outlined in T8 CCR General Industry <br /> and Construction Safety Orders. <br /> ' 902 Industrial Way•Lodi,CA 95240-209.367.3701 •Fax 209.369.4228 02012 Neil O.Anderson&Associates,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.