Laserfiche WebLink
Work Plan for Temporary Soil Vapor Probes Boyett Petroleum-Manteca <br /> June 17, 2008 419 S. Main Street,Manteca, California <br /> survey area: Manteca High School located at 450 E. Yosemite Avenue approximately, 1,400 <br /> feet northwest of the Site and Manteca Community Day School located at 680 Mikesell <br /> Avenue, located approximately 1,600 feet east of the Site. <br /> In a letter dated May 29 2003, Mr. Jefferey Wong of the San Joaquin County Environmental <br /> Health Department (SJCEHD) requested that a door-to-door survey of the residential area be <br /> conducted to supplement the previously submitted SRS. Condor conducted a door-to-door <br /> survey and visual inspection of the residential area within a 500-foot radius of the Site. The <br /> closest well found was located at 144 W. Wetmore Street, approximately 500 feet west <br /> (down-gradient) of the Site, the caretaker indicated she did not know the use of the well. <br /> Condor requested permission to sample the well; the well was sampled on August 6, 2003. <br /> Laboratory analysis indicated that TPHg, BTEX and gasoline oxygenates/additives were not <br /> detected at or above the laboratory detection limits. <br /> 2.0 FIELD INVESTIGATION <br /> The proposed scope of work consists of installing and sampling a total of two temporary soil <br /> vapor probes. The proposed soil vapor probes are located near areas of contamination and <br /> within 10 feet of the building. The proposed soil vapor probe locations are depicted on <br /> Figure 1. <br /> 2.1 Preliminary Field Activities <br /> Prior to initiating field activities, Closure Solutions will obtain the necessary drilling permits, <br /> prepare a Site Health and Safety Plan (HASP) for the proposed work, and clear the Site for <br /> rsubsurface utilities. The utility clearance will include notifying Underground Service Alert <br /> W <br /> (USA) of the pending work a minimum of 48 hours prior to initiating the field investigation, <br /> and securing the services of a private utility locating company to confirm the absence of <br /> underground utilities at each boring location. <br /> A HASP will be prepared for use by personnel implementing the Work Plan. The HASP will <br /> address hazards associated with the proposed field,work. A copy of the HASP will be <br /> available on-Site during field work. The subcontractor(s) performing field activities will be <br /> r <br /> provided with a copy of the HASP prior to initiating work. A safety tailgate meeting will <br /> also be conducted daily to review the Site hazards and work scope. <br /> i <br /> Page 4 of 8 Closure Solutions,Inc <br /> 1 <br />