Laserfiche WebLink
i <br /> Work Plan for Temporary Soil Vapor Probes Boyett Petroleum-Manteca <br /> June 17, 2008 419 S. Main Street, Manteca, California <br /> 2.2 Soil Vapor Probe Installation <br /> The soil borings for the on-Site temporary soil vapor probes SV-1 and SV-2 will be hand- <br /> cleared to approximately 3 feet bgs and the soil vapor samples will be collected at <br /> approximately 5 feet bgs using a direct drive technique such as GeoProbeg. Following the <br /> soil sampling and soil vapor sampling, the borehole will be grouted from the bottom of the <br /> borehole to grade with neat cement grout. The locations of SV-1 and SV-2 are illustrated on <br /> Figure 1. <br /> Construction design may be adjusted in the field d n litholo and current field <br /> g y � e base o gy <br /> conditions. A diagram of the temporary soil vapor probes is presented in Attachment B. <br /> ! <br /> 2.3 Soil Sample Handling and Analysis <br /> Each soil sample collected for soil parameter analysis will be covered at each end with <br /> Teflon TM sheeting, capped with plastic end caps and labeled. Soil samples will be submitted <br /> under chain-of-custody protocol to Kiff Analytical, a California State-certified analytical <br /> laboratory. Soil samples will be analyzed for the following parameters: density, organic <br /> carbon content (by the Walkee Black Method), soil moisture, effective permeability, <br /> porosity, and grain size distribution analysis. <br /> 2.4 Soil Vapor Sampling Protocol <br /> Soil vapor samples will be collected at least 20 minutes after probe installation from a depth <br /> of approximately 5 feet bgs. Soil vapor sampling will be conducted in accordance with <br /> Department of Toxic Substance and Control (DTSC) guidance included as Attachment C. <br /> • Soil vapor samples will be collected at least seven days after any measurable <br /> precipitation event. <br /> I <br /> • Hydrated bentonite will be placed around the drill rod prior to sampling to inhibit <br /> surface air migration down the outer.portion of the drill rod. <br /> • Prior to sampling, Closure Solutions will perform a leak check by placing isopropyl <br /> alcohol on the sample line fittings and the top of the vapor probe tubing (where the <br /> _ tubing exits the boring). <br /> Page 5 of 8 Closure Solutions,Inc <br /> i <br />