My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
3500 - Local Oversight Program
>
PR0545347
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 4:17:41 PM
Creation date
2/6/2020 3:24:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545347
PE
3528
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
02
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LBoyett Petroleum May 18, 2000 <br /> 419 Soutlz Main Street, Manteca, California Page 7 <br /> Work Plan for Lateral Extent <br /> Lof Grountlwater Contamination (Addendum) <br /> and electrical conductivity of the water will be noted on a field log. Instruments calibrated <br /> to known standards will be used to monitor these parameters. <br /> At least five (5) well volumes will be evacuated from each well, and more, if necessary, until <br /> the above parameters have stabilized. Wells that are de-watered before evacuation of five <br /> (5) well volumes has been accomplished will be sampled upon eighty percent of recovery of <br /> the initial water level. The wells or other sampling points will be sampled in order of the <br /> L least to most contaminated, as best known or estimated. The samples will be pumped from <br /> a stainless steel bladder pump or carefully poured from a Teflon® bailer into clean glass <br /> L vials with Teflon® lined screw caps and half-gallon plastic containers provided by the <br /> laboratory. Care will be taken to ensure that no air space exists in the vials by inverting to <br /> check for bubbles and re-sampling if necessary. <br /> LAll water samples will be analyzed or extracted within fourteen days according to their EPA <br /> methods. The samples will be analyzed using EPA method 5030/LUFT for gasoline <br /> Lpetroleum hydrocarbons, EPA method 8020 for BTX&E compounds, and EPA Method <br /> 8260 for oxygenates. <br /> L <br /> 6. <br /> L <br /> L <br /> L <br /> L <br /> L <br /> 6. <br /> L <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.