My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
3500 - Local Oversight Program
>
PR0545347
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 4:17:41 PM
Creation date
2/6/2020 3:24:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545347
PE
3528
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
02
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P' <br /> WHF, Inc., Environmental & Engineering Group <br /> Health & Safety Plan <br /> Page: 2 <br /> 3. Assuring that personnel are aware of the potential hazards associated with site <br /> operations. <br /> Soo <br /> f , 4. Monitoring the safety performance of all personnel to ensure that the required <br /> work practices are employed. <br /> 5. Correcting any work practices or conditions that may result in injury or <br /> exposure to hazardous substances. <br /> 7 6. Preparing any accident/incident reports (see attached Accident Report Form). <br />,6. <br /> 1.4 Project Employee <br /> Project Employees involved in on-site investigations are responsible for: <br /> 1. Taking all reasonable precautions to prevent injury to themselves and to their <br />�- fellow employees. <br /> 2. Implementing Health and Safety Program and reporting to the PSO for any <br /> action deviating from the anticipated conditions described in the Health and <br />: Safety Plan. <br /> k <br /> 1.5 Special Instructions <br /> It is the responsibility of the Project Manager and the Health and Safety Manager to <br /> review the available site information to determine, to what degree the Health and <br /> Safety Plan will be implemented. Each site will be handled on a case by case basis. <br /> 2.0 Safety Implementation <br /> The provisions of the WHF, Inc., Environmental & Engineering Group Health and Safety Plan <br /> are mandatory for all personnel associated with the site project and operations. <br /> A complete background review and site visitation will be conducted in order to determine <br /> whether specific amendments are to be made to the Health and Safety Plan based on specific <br /> characteristics which may exist on the job site. Any suspected hazards associated with the on- <br /> site operation which exposure to, via inhalation or skin absorption, to such as suspected <br /> L carcinogens or human sterilants, will be documented and specific guidance will be developed <br /> and added to this Health and Safety Plan as Appendices. <br /> L <br /> 6r <br />
The URL can be used to link to this page
Your browser does not support the video tag.