My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
3500 - Local Oversight Program
>
PR0545347
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 4:17:41 PM
Creation date
2/6/2020 3:24:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545347
PE
3528
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
02
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> WHF, Inc., Environmental & Engineering Group <br /> Health & Safety Plan <br /> Page: 3 <br /> L <br /> A defined project site layout is paramount to the safe completion of all remedial site <br /> L investigations. The project site layout has built-in safety features. The site is divided into <br /> three zones. The following list defines the required personnel protective equipment. <br /> L2.1 Personnel Protective Equipment (PPE) <br /> L Personnel who will be working in or around the exclusion zone of the job site will use <br /> the following protective equipment and measures as warrant by the Project Manager: <br /> L • Coveralls as an undergarment <br /> • Saranex outer garment <br /> L • Sample gloves (inner) <br /> • PVC, Nitrile or Neoprene outer gloves <br /> • Hard hat <br /> • Steel toe boots <br /> L • Robars or Tingley boots <br /> • Full face piece respirator with R53HE cartridges (a combination of organic <br /> vapor, acid gas, pesticide, radionuclide, high efficiency filter). Note that <br /> Lcartridges should be changed daily. <br /> • All joints to be taped <br /> L • Self-contained air will be utilized if project dictates <br /> r More stringent protective equipment requirements will be implemented if necessary. <br /> L This determination will be made by the project supervisor after review of the materials <br /> to be handled, the ambient monitoring data, consultation with on-site technical <br /> personnel, the Safety Officer, and the proper management personnel. Upgrades in PPE, <br /> L if necessary, will be implemented. <br /> L2.2 General Safety <br /> The on-site Safety Officer will be responsible for the following daily safety <br /> Limplementations: <br /> 2.3 Daily Safety Meetings <br /> r - <br /> L Each day prior to commencing work, a safety meeting shall be held to discuss safety <br /> considerations for the day's work to be done. A safety topic shall be addressed each <br /> day from the following list: <br /> L. <br /> • Site Safety Plan (first day and once a week thereafter) <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.