Laserfiche WebLink
SC&D Boy ett Petroleum <br /> 419 South Main Street May 22, 1998 <br /> Manteca, California Page: 2 <br /> 1 <br />' 1 <br /> The soil samples submitted for analysis from both the stockpiled soils and the dispenser <br /> ' locations were analyzed for gasoline by EPA method M 8015, BTX&E along with MTBE <br /> were analyzed by EPA method 8020. The results of that analysis are found in Tables 1 & <br /> 2 of this plan. <br /> 3.0 Scope of Work <br /> VVI-IF proposes two 2 shallow soils to a depth of 30.0' b to confirm the <br /> p P { ) .- g p � <br /> presence or absence of petroleum hydrocarbons and the vertical extent of the soil <br /> ' contamination in the unauthorized release area. The event will provide the data to <br /> evaluate the contamination at the dispenser island (Figure 2). Soil boring locations <br /> ' proposed in this scope of work are identified in Figure 3 of this work plan. <br /> 3.1 Drilling <br /> '• Permits will be obtained as necessary for all wells (including borings) before <br /> drilling begins. The soil boring will be accomplished using a mobile mounted <br /> ' drilling rig employing the use of a Geo-Probe System. <br /> All drilling equipment will be thoroughly cleaned before drilling begins, to prevent <br /> ' the introduction of contamination from off site, and between borings to prevent <br /> cross contamination. <br /> ' The borings will be logged under the direct supervision of a registered professional <br /> using the Unified Soil Classification System (Figure 4). The color, texture, <br /> moisture, plasticity (if applicable), consistency of the earth materials, pertinent soil <br /> or bedrock characteristics and any evidence of contamination will be noted. All <br /> water bearing zones and the depth at which they were encountered will be noted <br />' on these logs. <br /> All borings will be drilled in such a manner as to prevent cross contamination <br />' between strata. Exploratory soil borings within the unsaturated zone will be <br /> backfilled with a cement and three percent (3%)Bentonite mixture. <br /> The cuttings from the drilling operation will be containerized on-site during drilling <br /> for proper disposition. The proper method of disposal will be dependent upon <br /> results of laboratory analysis. This disposal will be the responsibility of the client <br /> unless other arrangements have been made. <br />