Laserfiche WebLink
Monitoring System Certification <br /> D. Results of Testing/Servicing <br /> Software Version Installed: <br /> Com tete the foliowin checklist: <br /> ® Yes ❑ No* Is the audible alarm operational? <br /> ® Yes ❑ No* Is the visual alarm operational? <br /> ® Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment <br /> will not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) <br /> ® N/A operational? <br /> ® Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> posir"e snuff-down'? (Check ail Thar apptyj ON Sump/Trench Sensors; ®Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br /> _- „ :s the n-Hill warning alarm visible and audible at the tank <br /> n �. j tilt nninr/ll anti nnv_ratin�rfr(?7erl�i% it s(),at wnat percent of tank c:3pactty does the alarm trigger? <br /> ® Yes* ❑ No Was any monitoring equipment replaced? it yes, identify s��`.�'.i:t_ Send}rs, ip;—Ob_c O n„]i,r &'pinniprli <br /> t'- - Y <br /> replaced and list the manufacturer name and model for ail replacement parts in Sect:en c,beio x- <br /> '± T=a found. inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> Il ❑Product; ❑ Water. If yes,describe causes in Section P. <br /> be! <br /> " iv0 ;;iv,11101[(i0riii SvSiciii i-ii icvicwcu i0 ICwc_' <br /> —., :.`..:: c: .. :•��: .o o.�•: ,a� � ^ anuf ^-rer'sspecifications? <br /> - c-EtiOn- L b=";iw,-de-scribe how and when these deficiencies were or will be corrected. <br /> E. Comments: 87 STP would not ppEfQrm onsifive shut down- Will need to replace Relay <br /> x.3/4 Annular would not go into Five] Alarm Will he hark tow-orrow .w :-e iia;e. <br /> --� F^^:*re iH be on site 9-9-10 at 2.,Oftm to Certify remaining Sensors- <br /> 3: <br /> nsorc3:an- a a"isr annumar tzxm,, ;eery^ "h <br /> Te-0 Passed <br /> - <br /> Page 2 of 3 <br />