Laserfiche WebLink
Monitoring System Certification , <br /> F. In-Tank Ganging/SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes D No* Were all probes reinstalled properly? <br /> rhi �nn;nm,�nt mannf%-mrj-r'S ma!ntenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ® Yes 1 ❑ No* I Fcr cquip;:urft <br /> .. n <br /> I r-i r>n I (Check all that anDiv) Simulated leak rate: DA 3 g.p.h.: ❑ 0.1 E.D.h ; ❑ 0.2 e.D.h. u <br /> +I II ® Yes I ❑ No* � Were all LLDs confirmed operational and -c=!_rale wirn=_� rPvtiiarnr,rPnnirt-mpnm I �- - � <br /> i� Ies I L-j Ac" ivu5 Like iG�aiil alipuI'diiiS pi lilii;llj dill Vl aia;u_ <br /> i <br /> �} ❑ Yes ❑ No* For mechanical LLDs,does the __T Tl , tri t r i:�_ i` w 1-M <br /> E N/A <br /> ® Yes ❑ No* For electronic LLDs,does the turbine automaticaiiy shut ori if the LLD detects a leak? <br /> ❑ N/A <br /> ® Yes ❑ No* For electronic LLDs, does the turbine automatically shut oto'if any portion of the monitoring systern is disabled i <br /> Il ❑ N!A or disconnected? <br /> ' 6 44 -or eiectronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> II f ❑ rid I malfunctions or fails a test? �. <br /> i1 ; y"es l ❑ No; 1 For electronic LLDs,have all accessible wiring connections been visually inspected? l <br /> El N/A <br /> i <br /> ® Yes ❑ No* Were all items on the eq ip ` <br /> Uescribe huw and when these deficiencies were or will be corrected. <br /> a• a•r <br /> —T"sYenis' o; o.r rr0i.i_ Tof_n,:c :v:_: -us_ivv S:ui .own, <br /> vu::: ::��� iL :c�::c•�ir r:::�s. <br />