Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES <br /> [] NO[] . <br /> 2.. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer train' <br /> person installing or testing any component that is repaired or7eplaced. Ensure a co of the <br /> Plan"is available on the jobsite as required by Ttle 8. ►ng certificates for each <br /> PY Site Health and Safety <br /> 3. Detailed description of work to be completed. List.components to be repaired or replaced.and <br /> to.scale showing location of repairs and/or replacements. if repairing a.component, describe how this will be done <br /> addin attach a diagram drawn <br /> -Zas , U ossa or other UST equipment, or performing tank to upgrade, use.the:UST Installation <br /> Paget 48.as necessary for a timely plan review): P Pg (If,. <br /> Application <br /> Af <br /> 4. ,List of equipment to 6e used(Attarh.manufacturet's specification sheets showing third-partyro <br /> a PP val); <br /> 2 , <br />