My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_2005 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 3:31:40 PM
Creation date
2/10/2020 11:37:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2012
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> M ulti-9ync Installation Instructions <br /> �P MUMOUR For Blueline Medium Fittings <br /> PL' This kit provides the Multi-'ync Repair for applications where the pipe is coming thru the <br /> sump wall straight or at an angle. <br /> WAI;IING Prepare all surfaces to be bonded prior to completing installation steps below. <br /> AASZ BL•FA-XJ6 Failure to follow each step will void warranty&may result in premature failure of penetration fitting. <br /> Page I This Kit appliesfor repairing 9ueline Medium Fittings <br /> General Instructions for: CLEANING:dray all surfaces to be bonded with DBC(leaner and allow to air dry or wipe excess with a dean dry <br /> doth. %rfaces must be dry before applying bonder. <br /> General Instrudionsfor: BONDINGTO POLYSUMPSORF189;GLASSSUMPR (lean,sand and rough up sump surfaces, dean fitting and <br /> apply aRTITEor DBFII between Bonding fang&sump wall. <br /> STEP 1: Remove Old Boot STEP2: Clean all Repair Components STIP 3: Place&Dry Rt CLff Rng,9eeve&Insert <br /> • Remove damps Clean all repair components with DBC Wrack the split cuff ring over the old fitting <br /> • Cut away old boot prior to installation Wrack the split insert over the pipe <br /> • Clean&sand fitting Mack the split sleeve over the pipe&up to the <br /> alff Cleaner Mit bonding ring with the fill port up <br /> 9eeve <br /> Rng <br /> F �� use <br /> Eccentriclnsert fMufti-SIM <br /> -SIM <br /> xi Insert R3duaer <br /> If everything fits continue with STEP 5: Install The Seeve,Cuff Fing&Insert STEP 6:Install&Bond Eccentric Insert&Multi-Sync <br /> the install. If there is a problem Apply Zip-Titeto the outer surface of the W-dueer Bade Together <br /> insert and fully seat inside of cuff Wrack Eccentric Insert around the pipe <br /> with the fit&function of these Apply Zip-Titeto the inner surface of the cuff Mack Multi-8,mc Reducer around the pipe <br /> parts,either adjust to make fit if ring and slide all the way onto the cuff Apply Zip-Tite to split area on Eccentric Insert,press <br /> possible,or call the factory(530- Flosition the sleeve with the fill port of the top endstogether&damp <br /> 5343966) for additional help Onoe you have the sleeve lined up correctly, Apply Zip-rite to split area on Multi-9,mc fbducer, <br /> 1.Apply a bead of Zip-rite all around the press ends together&damp <br /> STE'4: Bond 9eeve,00 Rng&Insert outer surface of the cuff ring <br /> • Apply Zip Titeto split cuff ring. Use 1 of 2. Side sleeve over cuff ring&snap in place <br /> the dampsto hold in place while curing. (fill port at top) <br /> • Apply Zip-Tete to the split insert and use 1 3. SE�the Clamp the around the sleeve& <br /> of the damps to hold in place while over the cuff ring and tighten ltmj-6J*: <br /> curing. <br /> • Apply Zip Tite to the split sleeve and use 2 <br /> damps to hold in place while curing. <br /> millill <br /> Leave these dam in ace for a II; <br /> damps place pprox 30 <br /> S' <br /> minutesfor curing before proceedingto i <br /> the next step <br /> �i� at <br />
The URL can be used to link to this page
Your browser does not support the video tag.