Laserfiche WebLink
TABLE 2 <br /> Dual Phase Extraction Vapor Field Data <br /> SUPER CENTER MART <br /> 701 East Charter Way, Stockton, CA <br /> Hours of Oxidizer DPE Liquid Total Air Flow Influent PID Effluent PID <br /> Date Operation Operational DPE Wells Temperature Ring Vacuum (SCFM) (ppmv) (ppmv) <br /> (°F) (in. Hg) <br /> 6/4/2013 3 8752.5 MW-1,MW-2 625 20 90 58 1 <br /> 6/10/2013 3 8756.0 MW-1,MW-2 625 23 90 44 0 <br /> 6/20/2013 ' 8994.5 MW-1,MW-2 630 22.5 71 62 1 <br /> 6/25/2013 9115.1 MW-1,MW-2 625 22 71 57 1 <br /> 6/28/2013 2 9169.7 - - - _ _ _ <br /> 7/9/2013 3 9170.3 MW-1, MW-2 625 22 71 39 0 <br /> 7/16/2013 9336.9 MW-1, MW-2 625 22 71 52 0 <br /> 7/25/2013 ' 9552.8 MW-1, MW-2 633 23 71 47 1 <br /> 7/30/2013 9672.4 MW-1, MW-2 626 23 71 68 1 <br /> 8/6/2013 9844.0 MW-1, MW-2 625 23.5 71 51 1 <br /> 8/13/2013 10,010.4 MW-1, MW-2 625 23 58 59 0 <br /> 8/14/2013 2 10,037.4 MW-1, MW-2 - - - _ - <br /> 8/27/2013 '•3 10,037.7 MW-1, MW-2 625 23.5 71 57 3 <br /> 9/26/2013 1•3 10,038.0 MW-1, MW-2, MW-3 630 22 81 206 3 <br /> 10/1/2013 10,160.1 MW-1, MW-2, MW-3 629 22 77 70 2 <br /> 10/10/2013 10,375.6 MW-1, MW-2, MW-3 625 22 77 64 1 <br /> 10/17/2013 10,539.7 MW-1, MW-2, MW-3 632 22.5 77 44 1 <br /> 10/24/2013 11 10,622.0 MW-1, MW-2, MW-3 625 23 77 84 3 <br /> 10/30/2013 10,768.8 MW-1, MW-2, MW-3 625 22 81 53 0 <br /> 11/5/2013 2 - - - - <br /> _ _ _ <br /> 11/18/2013 1•3 10,915.0 MW-1, MW-2, MW-3 650 22.5 72 72 2 M <br /> 11/22/2013 11,006.2 MW-1, MW-2, MW-3 - - - - - > _m <br /> 11/27/2013 11,131.2 MW-1, MW-2, MW-3 655 23 - 32 4 <br /> 11/29/2013 11,178.0 MW-1, MW-2, MW-3 - - _ _ _ <br /> 00 <br /> 12/3/2013 11,271.4 MW-1, MW-2, MW-3 650 22.5 69 49 0 M Z "- <br /> 12/11/2013 11,393.2 MW-1, MW-2, MW-3 650 20 82 49 0 rn r <br /> -t Z c , � <br /> Z 1 y <br /> Advanced GeoEnvironmental,Inc. <br />