My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_CLEANUP PLAN
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
22888
>
2900 - Site Mitigation Program
>
PR0542464
>
ARCHIVED REPORTS_CLEANUP PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 6:27:18 PM
Creation date
2/10/2020 4:42:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
CLEANUP PLAN
RECORD_ID
PR0542464
PE
2960
FACILITY_ID
FA0024404
FACILITY_NAME
CHEVRON FUEL TERMINAL 1001621
STREET_NUMBER
22888
STREET_NAME
KASSON
STREET_TYPE
RD
City
BANTA
Zip
95304
APN
23906015, 16, 17
CURRENT_STATUS
01
SITE_LOCATION
22888 KASSON RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' S E C 0 R - - - - - - - - - -- - - <br /> Cleanup Plan <br /> October 27, 2003 <br /> ' Page 14 <br /> • Total lead by EPA Method 60108. <br /> ' 6.5 Report <br /> Groundwater oxygenation point installation results will be included in the cleanup implementation <br /> ' report as described in Section 5.35. <br /> 7.0 SCHEDULE <br /> ' SECOR is prepared to initiate field work within four to eight weeks of approval of this Site Cleanup <br /> Plan from the RWQCB-CVR. A schedule detailing the timeline for the proposed activities described <br /> in Sections 5 and 6, is included as Figure 9. <br /> ' 8.0 REFERENCES <br /> ' Pacific Environmental Group 1995. Problem Assessment Report. 10 May 1995 <br /> Potter, Thomas L. Simmons, Kathleen E., 1998, Composition of Petroleum Mixtures, pp.102 ISBN 1-884- <br /> 940-19-6, Association for Environmental Health and Sciences(AEHS)web page <br /> ' (www.aehs.com). <br /> SECOR 1997. Second Quarter 1997 Self Monitoring Program and NPDES Sampling Report. 14 July. <br /> ' SECOR 2001. Revised Status Report of Additional Offsite Assessment and Work Plan for Changes to <br /> Monitoring and Reporting Program 94-811. 10 July. <br /> SECOR 2002a. Release Investigation Report.4 April. <br /> ' SECOR 2002b. Offsite Assessment Report and Site Assessment Work Plan.4 Nov.. <br /> SECOR 2002c. Construction Support Activities Report for the Chevron Ethanol Program. 28 June. <br /> ' SECOR 2003a. 2nd Quarter 2003 Groundwater Monitoring Report. 30 July. <br /> SECOR 2003b. 2003 Site Assessment Report. 5 March. <br /> ' SECOR 2003c. 2003 Aquifer Testing Report. 25 June. <br /> SECOR 2003d. 2003 Feasibility Study Report and Site Assessment Work Plan. 18 July. <br /> ' SECOR 2003e. ISO-GENtm Evaluation Report. 21 June. <br /> SECOR 2003f. 2003 Off-site Assessment Report. 13 October. <br /> U.S. Geological Survey (USGS), 1998a. Environmental Setting of the San Joaquin-Tulare Basins, <br /> ' California. <br /> USGS, 1998b. Water Quality in the San Joaquin-Tulare Basins, California, 1992-95. <br /> ' http://www.worldclimate.com. <br /> ' I:\Chevron\1001621\REPORTS\2003\2003-Cleanup Plan\Cleanup Plan.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.