Laserfiche WebLink
TABLE 2 <br /> GROUNDWATER ELEVATION,SEPARATE PHASE HYDROCARBON,AND ANALYTICAL DATA <br /> CONCEPTUAL SITE MODEL <br /> CHEVRON BULK FUEL TERMINAL 1001621 <br /> 22888 KASSON ROAD <br /> BANTA,CALIFORNIA <br /> Well ept rerun Ovate roundwa a as <br /> SPH SPH Total SP t y o a t <br /> Well Date Elevation To Water Elevation Elevation Thicknessemove Removed Diesel ;G,7s.lineenzen Toluene benzene Xylenes MtBE EPA 82608 <br /> Number Gau ed feet MSC feet,TOC feet,MSL Chane feet feet allons allons n /L /L /t !L /L /L <br /> MW-37UA 02/22/02 5.20 13.66 1.32 0.01 0.00 1.46 Well Not Sampled(product present) <br /> (cont.) 05/13/02 6.30 12.56 -1.10 0.02 0.00 1.46 Well Not Sampled(product present) <br /> 08/27/02 5.72 13.14 0.58 0.02 000 1.46 170,000 130 <0.5 <0.5 <0.5 <0.5 16 <br /> 12/04/02 6.87 11.99 -1.15 0.11 0.00 1.46 110,000 150 <0.5 <0.5 <0.5 <0.5 22 <br /> 03/05/03 6.83 12.03 0.04 0.01 0.00 1.46 170,000 510 <0.5 <0.5 <0.5 <0.5 29 <br /> 06/04/03 4.21 14.65 2.62 0.01 0.00 1.46 260,000 160 <0.5 <0.5 <0.5 <0.5 22 <br /> 09/04/03 3.97 14.89 0.24 0.01 0.00 1.46 950,000 190 <0.5 <0.5 <0.5 <0.5 46 <br /> 12/03/03 7.01 11.85 -3.04 0.01 0.00 1.46 160,000 240 <0.5 <0.5 <0.5 <0.5 28 <br /> 03/04/04 5.37 13.49 1.64 0.00 0.00 1.46 79,000 230 <0.5 <0.5 <0.5 1 <0.5 - 27 <br /> 06/15/04 4.25 14.61 1.12 - -- -- 630,000 220 <0.5 <0.5 <0.5 <0.5 - 24 <br /> 09/14/04 2.61 16.25 1.64 0.00 1 0.00 0.00 10,000 140 <0.5 <0.5 <0.5 <0.5 4 <br /> 12/14/04 6.03 12.83 -3.42 0.07 0.05 1.46 200,000 78 <0.5 <0.5 <0.5 <0.5 9 <br /> 03/15/05 3.67 15.19 2.36 0.00 0.00 1.46 610,000 4,400 <0.5 <0.5 <0.5 <0.5 24 <br /> 06/13/05 4.92 13.94 -1.25 0.00 0.00 1.46 580,000 350 <0.5 <0.5 <0.5 <0.5 20 <br /> 09/12/05 3.80 15.06 1.12 0.00 0.00 1.46 53,000 350 <0.5 <0.5 <0.5 <0.5 9 <br /> 12/14/05 6.03 12.83 -2.23 0.00 0.00 1.46 110,000 180 <0.5 <0.5 <0.5 <0.5 12 <br /> MW-38UA 11/04/96 5.66 -- -- 0.29 0.07 0.07 -- -- <br /> (DE-3) 02/05/97 1.22 0.04 0.03 0.10 -- -- <br /> 05/12/97 3.44 -- -- 0.10 90,000 1,500 <5.0 <5.0 <5.0 <5.0 <50 <br /> 08/13/97 4.61 <br /> 11/04/97 4.41 <br /> 02/09/98 0.79 - <br /> 05/26/98 3.02 _ <br /> -- -- -- -- -- -- -- <br /> 08/24/98 4.12 _ <br /> 11/16/98 4.92 <br /> 02/02/99 3.94 <br /> 06/14/99 6.12 <br /> 09/01/99 3.71 <br /> 11/30/99 5.93 <br /> 02/28/00 2.12 <br /> 06/27/00 3.74 0.00 0.00 0.10 560,000 3,100 <1.0 <1.0 <1.0 1.4 7.5 <br /> 08/21/00 3.51 0.03 0.00 1 0.10 -- -- <br /> 11/30/00 ------------------------------------------------------------Well Inaccessible(due to work on pipeline)-------------------------------------------------------------- <br /> 03/06/01 6.43 0.05 0.50 0.60 Well Not Sampled(product present) <br /> 04/23/01 5.48 0.00 0.00 0.60 Well Not Sampled(product present) <br /> 08/08/01 5.29 -- 0.01 0.00 0.60 Well Not Sampled(product present) <br /> 11/20/01 18.39 5.81 12.58 0.01 0.00 0.60 Well Not Sampled(product present) <br /> 02/22/02 4.71 13.68 1.10 001 0.00 0.60 -- 140 0.6 <0.5 <0.5 <0.5 3 <br /> 05/16/02 5.50 12.89 -0.79 0.01 0.00 0.60 260,000 140 1 <0.5 <0.5 <0.5 3 <br /> See Notes on Page 51. <br /> 3/24/2006 Page 37 of 51 <br /> J:\D0006\44634 00161022 Table 2 and 3.xls <br />