Laserfiche WebLink
TABLE 2 <br /> GROUNDWATER ELEVATION,SEPARATE PHASE HYDROCARBON,AND ANALYTICAL DATA <br /> CONCEPTUAL SITE MODEL <br /> CHEVRON BULK FUEL TERMINAL 1001621 <br /> 22888 KASSON ROAD <br /> BANTA,CALIFORNIA <br /> Well epth -Groundwater GroundwateiSPH SPH Total SPH as P as t y ata - t <br /> Well Date Elevation To Water Elevation` Elevation Thicknessemove Removed Diesel Gasoline Benzene Toluene benzene Xylenes MtBE EPA 8260B <br /> Number Gauged feet MSL feet,TOC feet,MSI Chane feet feet (gallons) (gallons) /L L /L /L /L /L /Lfun/Ll <br /> MW-38UA 08/27/02 5.25 13.14 0.25 0.01 0.00 0.60 46,000 120 0.6 <0.5 <0.5 <0.5 27 <br /> (cont.) 12/04/02 6.33 12.06 1.08 0.03 0.00 0.60 220,000 1,300 0.6 <0.5 <0.5 <0.5 21 <br /> 03/05/03 6.36 12.03 -0.03 0.02 0.00 0.60 300,000 1,700 0.7 <0.5 <0.5 <0.5 2 <br /> 06/04/03 3.91 14.48 2.45 0.02 0.00 0.60 270,000 580 2.0 <0.5 <0.5 <0.5 12 <br /> 09/04/03 3.57 14.82 0.34 0.09 0.01 0.61 780,000 210 0.9 <0.5 <0.5 <0.5 38 <br /> 12/03/03 6.52 11.87 -2.95 0.09 0.01 0.61 450,000 230 2 <0.5 <0.5 <0.5 3 <br /> 03/04/04 5.39 13.00 1.13 0.02 0.02 0.63 170,000 150 <0.5 <0.5 <0.5 <0.5 <0.5 <br /> 06/15/04 3.11 15.28 228 490,000 210 5 <0.5 <0.5 <0.5 0.5 <br /> 09/14/04 2.68 15.71 0.43 0.33 15.00 15.63 170,000 160 0.7 <0.5 <0.5 <0.5 59 <br /> 12/14/04 5.58 12.81 -2.90 0.00 0.00 15.63 170,000 170 <0.5 <0.5 <0 5 <0.5 <0.5 <br /> 03/15/05 3.21 15.18 2.37 0.00 0.00 15.63 880,000 7,500 <0.5 <0.5 <0.5 <0.5 <0.5 <br /> 06/13/05 4.55 13.84 -1.34 0.00 0.00 15.63 570,000 880 <0.5 <0.5 <0.5 <0.5 <0.5 <br /> 09/12/05 337 15.02 1.18 0.00 0.00 15.63 510,000 530 <0.5 <0.5 <0 5 <0.5 12 <br /> 12/14/05 5.55 12.84 -2.18 0.00 0.00 15.63 83,000 89 <0.5 <0.5 <0.5 <0.5 <0.5 <br /> MW-39UA 11/04/96 6.38 100,000 3,400 <10 <10 <10 <10 <50 <br /> (DE-4) 02/05/97 2.00 2,700 86 <0.5 <0.5 <0.5 <0 5 7.5 <br /> 05/12/97 4.35 28,000 390 <2.5 <2.5 <2.5 <2.5 <25 <br /> 08/13/97 4.38 <br /> 11/04/97 478 <br /> 02/09/98 0.49 <br /> 05/26/98 3.50 <br /> 08/24/98 3.79 _ <br /> 11/16/98 5.93 _ <br /> 02/22/99 4.31 0.01 <br /> 06/14/99 5.69 0.01 001 0.01 <br /> 09/01/99 -- 3.69 -- -- -- -- -- -- -- -- -- -- -- <br /> 11/30/99 5.24 <br /> -- -- -- -- -- - <br /> 02/28/00 2.31 <br /> 06/27/00 4.65 0.00 0.00 0.01 18,000 300 <0.5 <0.5 <0.5 <0.5 13 <br /> 08/21100 4.40 0.00 0.00 1 0.01 _ <br /> 11/30/00 Well Inaccessible(due to work on pipeline) <br /> 03/06/01 643 0.00 0.00 0.01 Well Not Sampled(product present) <br /> 04/23/01 6.49 000 0.00 0.01 40,000 1,100 <0.50 <0.50 <0.50 <0.50 15 <br /> 08/09/01 5.19 0.00 0.00 0.01 57,000 630 <0.50 <0.50 <0.50 <0.50 16 <br /> 11/20/01 19.38 6.74 12.64 -- 0.00 0.00 0.01 2,500 <50 <0.50 <0.50 <0.50 <0.50 18 <br /> 02/22/02 5.71 13.67 1.03 0.00 0.00 0.01 25,000 <50 <0.50 <0.50 <0.50 <0.50 19 <br /> 05/16/02 6.80 12.58 -1.09 0.00 0.00 0.01 19,000 <50. c c c c 20 <br /> 08/27/02 6.17 13.21 063 0.00 0.00 0.01 19,000 <50 c c c c 20 <br /> 12/04/02 724 12.14 -1.07 0.00 000 0.01 28,000 <50 _ 16 <br /> See Notes on Page 51. <br /> 3/24/2006 Page 38 of 51 <br /> J:\D0006\4463400161022Table 2 and 3.xls <br />