Laserfiche WebLink
COS January 1996 Meeting <br /> Page 3 <br /> The purpose of the scope of work proposed in this work plan is tocompile a complete site <br /> assessment report with all data obtained to date. All soil and groundwater analyses <br /> obtained to date should be tabulated: The estimated extent of the contamination should be <br /> contoured on cross sections which iniclude lithological strata and well construction details. <br /> A mass balance should be calculated for each concentration contour.' The environmental <br /> attenuation, leachability, waste characterization and monitoring well data presented in this <br /> report will be used to determine the risk of leaving the waste in place, or the benefit of <br /> establishing and implementing site specific cleanup goals. <br /> The compliance date for the work plan is February 29, 1996 <br /> The next meeting to discuss COS sites was scheduled for Tuesday, April 16, 1996 at 1:30 <br /> p.m. <br /> and will be held at the office of PHS/EHE). PHS/EHD appreciates the efforts of the COS to work <br /> cooperatively. <br /> Please contact either Mary Meat's at (209)46$-0337, Steve Sasson at (2091468-3459 or Linda <br /> Turkatte at (209)46&3441, if you have any questions or disagree with this summary. <br /> Donna Heran, RENS, Director <br /> nvironme tal Health Division <br /> I <br /> Diane M. Hinson, RENS <br /> Supervisor <br /> MMICOSI .MET <br /> cc: Elizabeth Thayer, CVRWQCB cc: Jim Escobar, COS Public Works <br /> cc: Stephen Chen, COS Public Works cc: Bob Murdoch, COS Public Works <br /> cc: K.D. Jones, Twinning cc: Tom Lutterman, Smith Environmental <br /> i <br /> 7 <br /> .i <br /> 's <br /> ; <br /> I <br /> I <br /> iI <br /> R <br /> i <br /> ,1 i <br />