Laserfiche WebLink
• 14 April 1999 <br /> AGE-NC Project No. 98-0481 <br /> Page 4 of 7 <br /> If air purifying respirators are authorized, respirators will be fitted with vapor organic or and dust <br /> g P <br /> cartridges for use with the involved substances and concentrations. The specified level of protection <br /> will shall only be made with the approval of the site safety officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Gary Dickenson Collect soil and/or ground water samples; <br /> well installation; drilling over-sight. <br /> FIELD CREW: TASK: <br /> Drill Rig Operator Advance borings, soil and ground water <br /> sampling, well installation, boring <br /> abandonment. <br /> Field Technician(if nee.) Clean equipment, soil and ground water <br /> sample handling, <br /> The works party(ies) shall be briefed on the content of this plan prior to initiating onsite work. <br /> 7.0. COMMUNICATION PROCEDURES <br /> If hearing is impaired, the following standard hand signals will be used: <br /> Hand gripping throat: Out of air; can not breath <br /> Grip partner's wrist or both hands around waist: Leave area immediately <br /> Hands on top of head: Need assistance <br /> Thumbs up: OK; I am alright; I understand <br /> Thumbs down: No; negative <br /> Advanced GcoEnvironmentai,Inc. <br />