My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HUTCHINS
>
305
>
3500 - Local Oversight Program
>
PR0545307
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 10:13:40 AM
Creation date
2/11/2020 8:57:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545307
PE
3528
FACILITY_ID
FA0000932
FACILITY_NAME
DOMINO'S #8588
STREET_NUMBER
305
Direction
S
STREET_NAME
HUTCHINS
STREET_TYPE
ST
City
LODI
Zip
95240
APN
03319020
CURRENT_STATUS
02
SITE_LOCATION
305 S HUTCHINS ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No.S8t113 4)6-M <br /> September 30, 1994 <br /> Page 4 <br /> proposed locations shown on Figure 2. The borings will be advanced utilizing a <br /> truck--mounted drill rig equipped with a minimum of 10-inch diameter hollow stem <br /> augers. Bongs GB-8 and 68.9 will be advanced using angle drilling techniques <br /> beneath the existing structure. 'Borings GB-6 through GB-11 will be drilled to a <br /> maximum depth of approximately 55 feet bgs. Borings MW-4 and MW-5 will be <br /> drilled to a maximum depth of approximately 70 feet-bgs for subsequent monitoring <br /> well installations. <br /> • Collect relatively undisturbed soil samples at five foot intervals using a split spoon <br /> sampler equipped with three 6-inch-long by 2-inch diameter brass sample tubes. The <br /> borings will be logged under the supervision of a California registered end <br /> and/or geologist utilizing the unified Sail Classification System. The sample tubes <br /> will be capped, labeled, chilled, and transported to a California-certified <br /> environmental labtratory utilizing standard chain-of-custody procedures. <br /> Perform headspace surveys on the soil samples collected usinga portable organic <br /> vapor analyzer(OVA),equipped with a photo ionization detector(PID). Headspace <br /> readings represent qualitative indicators of the presence of organic vapors in thei <br /> pore space of the soil samples collected. The-headspace readings will be recorded` <br /> on the boring logs submitted with the final report. <br /> Submit up to Air soil umpla lrrcr seri boring to the analytical laboratory for testing <br /> for TPHg and TPHd using EPA Test Meths d 8015 modified and BT$X following <br /> EPA Test Method 8020. Approximately ten soil samples will also be analyzed for <br /> MTBE following EPA,'Test Method 8o20. <br /> Quality assurance/quality control procedures will be provided during the field <br /> .exploration.activities. Theserocedures included cleansin rothe- g <br /> lin <br /> p 8/ in ` f <br /> equipment,steam cleaning augers prior to and between borings,and providing chain <br /> of dMody documentation for each soil sample transferred to the laboratory. <br /> `Cleansin rinsin of the sampling equipment will be performed prior to the <br /> . 8/ g P gP <br /> collection of each soil sample by washing the equipment with a trisodiwn phosphate <br /> solution.followed.try subsequent tap water and deionized water rinses. <br /> Soils generated red <br /> during the excavation activities will be Moate X55 g�tt�n <br /> drums .066 ing the results of the laboratory analyses and subsequent. disposal <br /> following regulatory protocol. <br /> Task IV - Installation of,V�r��;traction Wells <br /> • Install vapor extraction wells within three to five ;of the onsite borings with: <br /> detectable Petroleum hydrocarbon impacts'based on field screening. Ibe vapor <br /> extraction wells will be constructed using 44neh diameter polyvinyl chloride(PVC) <br /> using..The vapor wells will be constructed using approximately 30:feet of 01140-inch <br /> slotted scr.een PVC casing between approximately 5., - . A filter pack <br /> consisting of No. 3 Monterey sand will be trimmedd around the scan from the. <br />
The URL can be used to link to this page
Your browser does not support the video tag.