Laserfiche WebLink
Project No.580804*-02 <br /> September�% .1.994 <br /> Page 5 <br /> bottom of the screen interval to an elevation of two feet above the screen zone. A. <br /> two foot thick seal consisting of hydrated bentonite chips will be plaice above the <br /> filter pack. ,;Above the seal a mixture of bentonite powder and cement willbeplaced <br /> to within two feet of grade I el. A minimum 14-inch diameter,.traffic-rated s�urity: <br /> wellhead cxrirer set in a concrete pad will be used to complete construction. <br /> V•Installation of Graun(water MaWlofing Wells <br /> • Install offsite groundwater monitoring wells MW4 and BCW-5'i th adjacent public <br /> right-of-ways a; the locations depicted on Figure 2., The wells vvilt be;installed to: <br /> depths of'Tf l;feet below the groundwater surface. The monitoring wells will be: <br /> constructed using 2-inc diameter poCyvin l chloride (PVC) casing 1`he lover <br /> portion of the w will be constructed using 2g tedi of 0 CdQi�d d6ttedl sheen. <br /> PVC casing. A ;fitter pack consisting of No. 3 Monterey, and will be trimmed <br /> around the screen from the bottom of the boring to an elevation of two feet above <br /> the screen zone. A two foot thick seal consisting of hydrated bentonite chips wfll be. <br /> placed above;the filter pack. Above the seal a mixture of bentonite powder and <br /> cement will be placed to within two feet of grade level. A minimum 14-inch <br /> diameter, traffic-rated security wellhead cover set in a concrete pad will be used to <br /> complete construction. <br /> • The top of using elevations for the new groundwatermonitoring wells will be <br /> surveyed relative to the designated temporary benchmark. <br /> Task 3a - Groundwater W Development. J"gfgiug and SaMWing <br /> No less than 448 hours after the completion of well construction,, develop the <br /> groundwater monitoring welts for approximately 10 minutes (or until turbidity <br /> stables)utilizing a surge block. <br /> No less than hours after the completion of well development the depth4ow <br /> groundwater will be:measured with a electronic water level meter. 'Ih+e water l <br /> meteor will be clearte l with liquinox solution and triple rinsed prior to introduction <br /> into a new well. <br /> Three to five rehole volumes of groundwater will be purged to attow <br /> formation water to infiltrate the wells. During purging, the pH; temperature, and: <br /> electrical conductivity of the groundwater will be measured. <br /> Fallowing -purging, water will be collected from each well. with a pre-cleaned' <br /> disposable bailer. The collected water will be decanted into appropriate sampling <br /> containers supplied by the analytical laboratory. Upon collections, the saw <br /> containers will be sealed, labeled and placed into an ice-chest coaled with blue <br /> pending delivery to the laboratory. Samples will be collected and transported under <br /> standard chain-of-custody documrentation. <br />