My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003135
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HUTCHINS
>
305
>
3500 - Local Oversight Program
>
PR0545307
>
ARCHIVED REPORTS_XR0003135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 10:29:02 PM
Creation date
2/11/2020 9:01:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003135
RECORD_ID
PR0545307
PE
3528
FACILITY_ID
FA0000932
FACILITY_NAME
DOMINO'S #8588
STREET_NUMBER
305
Direction
S
STREET_NAME
HUTCHINS
STREET_TYPE
ST
City
LODI
Zip
95240
APN
03319020
CURRENT_STATUS
02
SITE_LOCATION
305 S HUTCHINS ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Michael Infurna <br /> Diane Hinson <br /> October 18, 1995 <br /> Page 4 <br /> the To b History of Operations at the ARCO site (former Ekon Station) <br /> additi <br /> and tl Autotromc leased the ARCO site in 1971 We have been unformed by <br /> indica counsel for Autotronic that in 1971 Autotronic developed the site as a gasoline <br /> contai station which included the installation of a UST system Autotronic operated <br /> a retail fuel facility at the site under the name "Fill 'Em Fast" until 1986 <br /> under In 1986, the Autotronrc's lease was assigned to Mel Bokides <br /> (PSA Petroleum, Inc Mel Bokides Petroleum operated an Exxon Station at the site <br /> disci: until some time in late 1994, at which time it is our understanding the site was <br /> the R shut down The site has been re-opened and presently is being operated by <br /> additi Bokides as ARCO retail fuel facility <br /> group <br /> site b c SaWling Results indicate that operators at both Too and <br /> and b ARCO sites are responsible for contamination <br /> Parte <br /> feet t The PAR makes clear that the soil beneath the Togo's site is <br />. gasol h, contaminated with petroleum hydrocarbons associated with the historical <br /> detect operations of the gasoline service station and attendant UST systems See <br /> MTB PAR, page 17-20) In addition to earlier investigations, which revealed soil <br /> after contamination in the vicinity of the second generation UST system, further <br /> investigation by Geocon has revealed hydrocarbon contamination underneath <br /> the Togo's structure, where the first generation UST was located ad ) <br /> previ, Geocon has concluded that, given the pattern of lateral migration of <br /> coni hydrocarbons in the soil at the Property, the soil contamination at the Property <br /> expre is attributable to leakage of both the first and second generation UST systems <br /> Clear See PAR, page 22) <br /> prop( <br /> prior Thus, based on the above, all of the past oil company operators at the <br /> this r Togo's site are collectively responsible for the soil contamination at the site <br /> FDIC Further, if the County believes that ground water contamination beneath the <br /> Togo's site is attributable in part to an on-site source and/or requires additional <br /> investigation of ground water, all of the past oil company operators at the <br /> Togo's sntey should be responsible for conducting additional groundwater <br /> investigation and remediation, if necessary The FDIC believes it is <br /> ? reasonable and appropriate for these past operators to be ordered by the <br /> Togo County to take over the investigation and cleanup activities at the Togo's site <br /> towa <br /> DOWNEY BRAND SEYMOUR & ROHWER <br />
The URL can be used to link to this page
Your browser does not support the video tag.