My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003174
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HUTCHINS
>
305
>
3500 - Local Oversight Program
>
PR0545307
>
ARCHIVED REPORTS_XR0003174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 11:13:54 AM
Creation date
2/11/2020 9:06:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003174
RECORD_ID
PR0545307
PE
3528
FACILITY_ID
FA0000932
FACILITY_NAME
DOMINO'S #8588
STREET_NUMBER
305
Direction
S
STREET_NAME
HUTCHINS
STREET_TYPE
ST
City
LODI
Zip
95240
APN
03319020
CURRENT_STATUS
02
SITE_LOCATION
305 S HUTCHINS ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No 58080-06-02 <br /> May 5, 1995 <br /> ' removal and replacement) of the Togo restaurant, the design and construction of a shoring system <br /> that would be required to provide slope stability around the entire excavation perimeter and the <br /> ' necessity to transport the excavated soil to a treatment facility or a landfill for disposal <br /> For obvious economic reasons, this option will not be given further consideration <br /> ' 513 Onsite Soil Aeration <br /> The use of this option would require the direct excavation of soil prior to aboveground treatment <br /> either by aeration or vapor extraction Additionally, space limitations preclude the ability to <br />' stockpile the excavated soil prior to aboveground treatment For implementation and economic <br /> reasons, this option will not be given further consideration <br /> 5 4 Offsite Soil Treatment <br />' This option would require the direct excavation of soil and is not feasible for the same reasons <br /> presented in Section 5 2 <br /> X Y <br /> 5 5 Landfilling <br /> This option would require the direct excavation of soil and is not feasible for the same reasons <br /> presented in Section 5 2 <br /> 1 <br /> 5 6 Bioremediation <br /> The design of an in-situ soil bioremediation system typically includes provisions for the injection <br /> of air,,,water and nutrients into the plume for the purpose of enhancing the biological growth of <br /> -27- <br />
The URL can be used to link to this page
Your browser does not support the video tag.