Laserfiche WebLink
Project No 58080-06-02 <br /> May 5, 1995 <br /> ' removal and replacement) of the Togo restaurant, the design and construction of a shoring system <br /> that would be required to provide slope stability around the entire excavation perimeter and the <br /> ' necessity to transport the excavated soil to a treatment facility or a landfill for disposal <br /> For obvious economic reasons, this option will not be given further consideration <br /> ' 513 Onsite Soil Aeration <br /> The use of this option would require the direct excavation of soil prior to aboveground treatment <br /> either by aeration or vapor extraction Additionally, space limitations preclude the ability to <br />' stockpile the excavated soil prior to aboveground treatment For implementation and economic <br /> reasons, this option will not be given further consideration <br /> 5 4 Offsite Soil Treatment <br />' This option would require the direct excavation of soil and is not feasible for the same reasons <br /> presented in Section 5 2 <br /> X Y <br /> 5 5 Landfilling <br /> This option would require the direct excavation of soil and is not feasible for the same reasons <br /> presented in Section 5 2 <br /> 1 <br /> 5 6 Bioremediation <br /> The design of an in-situ soil bioremediation system typically includes provisions for the injection <br /> of air,,,water and nutrients into the plume for the purpose of enhancing the biological growth of <br /> -27- <br />