My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
212
>
3500 - Local Oversight Program
>
PR0545309
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 9:40:49 PM
Creation date
2/11/2020 9:11:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545309
PE
3528
FACILITY_ID
FA0010339
FACILITY_NAME
H&H ENGINEERING CONST INC
STREET_NUMBER
212
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206-3920
APN
17728019
CURRENT_STATUS
02
SITE_LOCATION
212 INDUSTRIAL DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ground Zero Analysis,Inc. <br /> SITE SAFETY PLAN <br /> Job Name: Wilbur Ellis/H & H Engineering .3 <br /> Job Location: 212 Industrial Drive, Stockton, California <br /> I Client Name: Wilbur-Ellis Company <br /> I <br /> Project Number: 594 Date: August 27, 2004 <br /> General Work Description: Advance seven soil borings to approximately 40 feet bgs, collect <br /> soil and groundwater samples to further define the lateral extent of groundwater contamination. <br /> 1 ' <br /> SSP Prepared by: Joe Vasquez <br />+ On-site Safety Officer: Joe Vasquez <br />+ Project Safety Officer: Greg Stahl <br /> This site safety and health plan (SSP) must be kept on-site and accessible to all on-site employees <br /> during all phases of site operations. The SSP must beI'reviewed and signed by all on-site <br />{ employees, subcontractors, and visitors prior to entering the;site. <br /> 4 The provisions set-forth in this SSP shall apply to Ground Zero Analysis, Inc. (GZA) employees <br /> F and any subcontractors working for GZA at the job site. All personnel working for GZA at the <br /> job site must read this SSP, and sign the attached Compliance Agreement before entering the <br /> work area. Field personnel may deviate from the safety provisions set-forth in this SSP, but only <br /> to upgrade or increase the safety requirements. GZA personnel may suspend work if unsafe <br /> working conditions are identified or observed, or unauthorized modifications to the safety <br /> provisions set-forth in this SSP are made. If changes in site or working conditions require <br /> changes in safety procedures, appropriate amendments to this SSP will be provided by the GZA <br /> project manager or supervisor, with the written approval of a GZA branch safety officer or the <br /> GZA Health and Safety Director. <br /> PAGE 3 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.