Laserfiche WebLink
Ground Zero Analysis,Inc. <br /> SITE SAFETY PLAN <br /> Job Name: Wilbur Ellis/H & H Engineering .3 <br /> Job Location: 212 Industrial Drive, Stockton, California <br /> I Client Name: Wilbur-Ellis Company <br /> I <br /> Project Number: 594 Date: August 27, 2004 <br /> General Work Description: Advance seven soil borings to approximately 40 feet bgs, collect <br /> soil and groundwater samples to further define the lateral extent of groundwater contamination. <br /> 1 ' <br /> SSP Prepared by: Joe Vasquez <br />+ On-site Safety Officer: Joe Vasquez <br />+ Project Safety Officer: Greg Stahl <br /> This site safety and health plan (SSP) must be kept on-site and accessible to all on-site employees <br /> during all phases of site operations. The SSP must beI'reviewed and signed by all on-site <br />{ employees, subcontractors, and visitors prior to entering the;site. <br /> 4 The provisions set-forth in this SSP shall apply to Ground Zero Analysis, Inc. (GZA) employees <br /> F and any subcontractors working for GZA at the job site. All personnel working for GZA at the <br /> job site must read this SSP, and sign the attached Compliance Agreement before entering the <br /> work area. Field personnel may deviate from the safety provisions set-forth in this SSP, but only <br /> to upgrade or increase the safety requirements. GZA personnel may suspend work if unsafe <br /> working conditions are identified or observed, or unauthorized modifications to the safety <br /> provisions set-forth in this SSP are made. If changes in site or working conditions require <br /> changes in safety procedures, appropriate amendments to this SSP will be provided by the GZA <br /> project manager or supervisor, with the written approval of a GZA branch safety officer or the <br /> GZA Health and Safety Director. <br /> PAGE 3 <br /> i <br />