Laserfiche WebLink
� G <br /> 113 <br /> Ground Zero Analysis,Inc. <br /> SITE SAFETY PLAN <br /> FACILITY BACKGROUND <br /> An underground storage tank was removed from the site in 1987. Subsequent subsurface <br /> investigation consisting of the sampling of numerous soil'.borings and the installation of three <br /> groundwater monitoring wells identified the presence of;;gasoline contamination in soil and <br /> groundwater. The lateral extent of groundwater contamination upgradient and downgradient of <br /> the former tank is not completely defined. The proposed work is intended to complete the <br /> definition in these quadrants. <br /> WORK PLAN <br /> Task One: Supervise the drilling and sampling of seven soil borings. <br /> 1 <br /> PAGE 4 <br />