Laserfiche WebLink
.•,,� --up 1 1ng proceclurP <br /> Decontamination will be done with steam cleaner onl arger equipment and <br /> deionized water with Spic and Span on smaller equipment. <br /> Several soil samples will be taken to determine the grain size <br /> distribution of the soil encountered at the site. <br /> All soil temporary removed will be stockpiled on a 10 mil plastic sheet <br /> and a 10 mil plastic sheet will be used to cover the soil to control <br /> any gasoline contaminates from leaving the temporary pile of soil . No <br /> soil will be allowed to leave the project site area as shown on figure <br /> 2. <br /> All soil samples taken will be tracked by a formal chain-of-custody of <br /> samples to maintain the integrity of samples taken. All soil samples <br /> taken from the field shall be placed in glass soil sampling containers <br /> provided by California Water Labs. Once a sample is taken it shall be <br /> immediately sealed, labeled and placed in a cold storage box for <br /> transportation to the laboratory. Each sample taken will be issued its <br /> own sample identification number for identification proposes. <br /> Laboratory analysis of soil shall conform to EPA 8020 or tW. The <br /> laboratory analysis will be conducted by California Water Labs, Inc. <br /> in Modesto, California. <br /> Upon receiving the laboratory report we will prepare a Soil Remediation <br /> Proposal for San Joaquin County Environmental Health District and <br /> California Regional Water Quality Control Boards review. <br /> TIME SCHEDULE <br /> Our time schedule is four weeks from the time we receive County <br /> approval to start work to the time we' submit a Soil Remediation <br /> Proposal with the laboratory finding and our recommendation for cleanup <br /> of project site. <br /> HEALTH PLAN <br /> A six foot chain-link fence will be erected around soil removal area <br /> to prevent anyone entering the area. Area entrance will be through a <br /> ten foot gate to the area. The fence will remain in place until the <br /> soils are returned to the hole. Warning signs will be placed on the <br /> fence and the gate to the area will be padlocked. A photoionization <br /> device will be used to monitor area in which workers will be present <br /> to protect those workers. Appropriate cloth overalls and rubber gloves <br /> will be worn to protect those in immediate contact with soil . Nearest <br /> hospital to the project site is Lodi Memorial located at 975 South <br /> Fairmont in lodi . <br /> b <br />