Laserfiche WebLink
i <br /> I <br /> Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> E <br /> As a minimum Level D protection is required on all GZA work sites. Level D includes: <br /> ✓ Steel toed boots <br /> ✓ Safety Glasses <br /> ✓ Hard Hat <br /> For each task on this project, identify additional protective garments as required, include the <br /> conditions under which the level of PPE would be modified for 'each task. <br /> ;c <br /> Task(sf Condition Personnel �Garment(sl <br /> None Working Near Vehicle Orange Vests <br /> 1,2 >20 ppm for 5 minutes 1/2 Face Respirator <br /> 1,2 >200 ppm for 5 minutes Evacuate Site Full Face Respirator <br /> f <br /> j <br /> SITE CONTROL AND COMMUNICATIONS <br /> i <br /> Y <br /> The buddy system must be used on all GZA hazardous waste sites. <br /> Site will be secured as follows: Fencing will be used when possible. <br /> Work Zones will be marked as follows: Barricades and caution tape will be used to mark off <br /> work zone. <br /> MARK WORK ZONES ON SITE MAP O CHECK WHEN DONE. <br /> .PAGE 7 <br /> II <br />