Laserfiche WebLink
1 <br /> Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN , <br /> On-site communications: ❑ Radio ® Verbal ❑ Hand Signals <br /> 1 <br /> ❑ Other <br /> Designate hand signals here: <br /> Off-site communications: ❑ Radio IM Telephone- <br /> ❑ Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an.evacuation is: Verbally Given <br /> Evacuation assembly point is: Office building <br /> MARK EVA CUA TION ROUTE(S) ON SITE MAP O CHECK WHEN DONE <br /> 1 <br /> SANITATION AND DECONTAMINATION a <br /> Personnel Decontamination Procedure: d <br /> All contaminated personal protective equipment (i.e., gloves coveralls) will be placed on and } <br /> covered with 6-mil plastic sheeting along with the drill cuttin-gs? <br /> Location of Wash Water: At site. <br /> E <br /> Location of Toilet: At site. <br /> Location of Drinking Water: At site. <br /> MARK LOCA TION OF EYEWASH AND SHOWER DRENCH ON S/TE MAP O CHECK WHEN DONE <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned. I <br /> i <br /> Materials to be Disposed of as Hazardous Waste: All soil and water produced will be stored on- r <br /> site until: appropriate disposal methods are <br /> determined. <br /> • i <br /> i <br /> PAGE <br /> i <br />