Laserfiche WebLink
k <br /> R FELDMAN , WALDM N & KLINE <br /> MURRY J.WALDMAN - <br /> ALLEN E.KLINE - A PROFESSIONAL CORPORATION <br /> LELAND R.SELNA.JR. fEW IA <br /> MARC H.MONHE IMER ATTORNEYS AT AW <br /> DONALD H.KANE -SPERRY BUlLOSN <br /> BHOLZ <br /> r <br /> MICHAEL L.KOR <br /> LAWRENCE 9.SILVER 146-148 WEST WEBER AVENUEt-,,•.. <br /> RICHARD L.JA EGFR �-.• 9 fFlt <br /> HOWARD M.WEXLER STOCKTON,CALI FOR NIA 95202 ��,�� � �) ', Sa7 <br /> THOMAS M.YUCKERMAN <br /> JEFFREY W.SHOPOFF MCI 10:210-422 <br /> 11 <br /> PATRICIA S.MAR <br /> KENNETH W.JONES TELEX 6SO 210 4i.23 ENVIROMENTAL HEALTH <br /> GORGE V.HARTMANN ZAPMAIL 209-465-8536 i C <br /> GEORGE G.WEICKHAROT FERMI('F,SERVICES <br /> MICHAEL K.BEYER TELEPHONE(209)943-2004 <br /> GERALD A.SHERWIN <br /> ROBERT E.WHITE <br /> PAV L J-PION <br /> VERN S.BOT HWELL <br /> L J.CHRIS MARTINIAK <br /> KENNETH A.FREED SAN FRANCISCO OFFICE <br /> JOSEPH E.RAS CH-CHABOT <br /> GLENN A.ZAHLER 235 MONTGOMERY STREET <br /> PATRIC IA E.LGCKARY <br /> CHRISTINE A.AMATRUDA SAN FRANCISCO. Ri31A 94104 <br /> 1-130 <br /> ROBERT C.GOODMAN October 21, 1987 (415) 981-1300 <br /> MARTHA J.SHAVER - <br /> RES <br /> M.CENICEROS <br /> NICK A.BOODROOKAS <br /> CINDY M.CARDULLO <br /> STEVEN L.VETTEL LOS ANGELES OFFICE <br /> STEVEN K.DEN EBEIM <br /> LAURA GRAD 404 NORTH ROXB URY DRIVE,SUITE 000 <br /> JULIE JONES BEVERLY HILLS.CALIFORNIA 90210 <br /> HELEN H.KANG (213)274-8 19 1 <br /> B.IFL1SE GAUTIER <br /> Larry E. Phillips <br /> Project Manager <br /> Brown and Caldwell Consulting Engineers <br /> 723 S Street <br /> Sacramento, California 95814 <br /> Re: ARCO Service Station 434 <br /> 501. W. Kettleman Lane, <br /> Lodi, California <br /> Dear Mr. Phillips: <br /> This letter will confirm our conversation last week and <br /> will address some of the concerns and needs of the City of Lodi <br /> with respect to the December 1986 fuel leak at the ARCO station at <br /> 501 W. Kettleman Lane in Lodi. This office has been retained to <br /> represent the City of Lodi in this matter. I understand that your ,,.y, <br /> office has been hired by ARCO to collect data and formulate a plan <br /> for the clean-up. <br /> You explained that your firm plans to drill two additional <br /> off-site wells to determine the extent of the contamination. You <br /> expect that the necessary permits will be obtained and the driller <br /> will be at work before the end of this month. Your engineers will <br /> use the data obtained from those wells, and the other data <br /> previously collected, to then formul to a remedial plana You <br /> anticipate that the plan will call f r (a) installation of a <br /> recovery well to capture the contaminated ground water which will <br /> be extracted, treated and disposed of and {b} soil venting and <br /> vapor recovery of the contaminated soil in the leak area. You <br />