Laserfiche WebLink
sp <br /> 5 - TABLE OF CONTENTS <br /> `INTRODUCTION......... .................:....... ....... ..................... ..............................I <br /> 2. SITE BACKGROUND... ................................. .. ..... ........................... ..........:1 <br /> 3. FIELD AND ANALYTICAL METHODS................ ..........................................................I <br /> 3-3- SITE PREPARATION......................----....................................... I'-•:-------: --._..................._.:............................-...I <br /> 3.2 DRILLING PROCEDURES ... .................................................•...-------.................:............-..........-......--• ------. -....2 <br /> I <br /> 3.3 . SOIL BORINGS AND GROUNDWATER SAMPLING.................... ................ ....................--..... -- ---.....-.....2 <br /> 3.4 MONITOR WELL INSTALLATION -- :..':..........................................................3 <br /> 3.5 MONITOR WELL CONSTRUCTION................. ................. ..... :............ .............. <br /> 4 3.6 MONITOR WEI L SURVEYING;DEVELOPMENT,AND SAMPLING.. ......................................................................4 <br /> I{ 3.7 LABORATORY ANALYSIS------------------. , I ...................... 4 <br /> it <br /> 4. WATER WELL INVENTORY...:......... ..... <br /> 5. PROBLEM ASSESSMENT REPORT PAR ...............................................5 <br /> { 6. SCHEDULE. ...........:... ....... .................. ........ ................................. ......... . ......6 <br /> l.� A LIST OF APPENDICES <br /> APPENDIX A <br /> Figure I Vicinity Map <br /> Figure 2 Proposed Soil,Boring and Monitor Well Locations <br /> Figure 3 Proposed Monitor Well Construction Diagram.' - <br /> APPENDIX B - <br /> Ilealth and Safety Plan <br /> d; <br /> L� - CONDOR. <br />