Laserfiche WebLink
Work Plan-Soil and Groundwater Investigation <br /> New Jerusalem School <br /> _ October 26,1998 <br /> fPage-G- <br /> 6. SCHEDULE <br /> Upon approval of this wort: plan by the PHS/EM and notification from New Jerusalem School District; <br /> to proceed, Condor can conduct the field and research elements described in this work plan within three l <br /> weeks_ Standard turn-around-tinge for laboratory analyses is two,weeks. Upon receipt of the laboratory " <br /> results, Condor can.submit a draft copy of the"PA_ R to New Jerusalem School, for review and comment <br /> within three weeks. If you have any questions or require additional information, please call Dave Meade " <br /> a -(209)234-0518. <br /> Respectfully submitted, <br /> P y suGC6 <br /> -CONDOR EARTu TECHNOLOGIES, INC. G. tp <br /> Q: -_ <br /> E <br /> E <br /> DONALD F KR - - - <br /> R. David Meade - �� Donald F.Kresse <br /> 10.6430 <br /> —Sr.Project Manager - , "California Registered <br /> �jyrF <br /> Geologist#6430 <br /> _ P_i2500P New JerusalemlNe",J Work Pian.doc _ — -f <br /> L1� _ CONDOR i <br />