My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012744
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
3500 - Local Oversight Program
>
PR0545339
>
ARCHIVED REPORTS_XR0012744
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:22:06 PM
Creation date
2/11/2020 4:43:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012744
RECORD_ID
PR0545339
PE
3528
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
02
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 16, 1991 <br /> ARCO Service- <br /> Station No. 2076, Lodi. California <br /> FstimIkle of r,,xqavatcd Soil <br /> avity and <br /> excavated from the existing tank c <br /> We estimate 350 cubic yards of soil may be <br /> trenches. The estimate of the volume of soil is based on (1) tile dimensions <br /> Product-line Lccupicd by the <br /> of the existing tank cavity (46 feet by 24 feet bY I-) feet) and the Volume hexcavated <br /> existing tanks(4,024 cubic feet)and(2)the anticipated dimensions of tile Ir <br /> cnc <br /> by 3 feet). Wees estimate ail <br /> during the removal of the product Piping (140 feet by 2 feet <br /> additional 530 cubic yards of soil will be excavated from the proposed tank cavity, (60 feet <br /> by 20 feet by 12 volume will vary <br /> and product lines. Tile actual Iry depending on the final <br /> depths of the excavations. <br /> Soil from the former and proposed tank cavities will be stockpiled separately onsite. -17he <br /> ing to restrict vapor emissions and control dust. <br /> stockpiles will be covered with plastic shect tile stockpiles and analyzed for hydrocarbons <br /> Composite soil samples will be collected from <br /> soil can be classified as nonhazardous. <br /> and to evaluate whether the so <br /> Results of analyses of samples of stockpiled soil will be submitted to tile SjCP14S-e estimEHD and <br /> ate <br /> we will obtain authorization to place soil in the former tank cavity. W <br /> k cavity and 43b0 <br /> approximately 450 cubic yards of soil can be backfilled into the former tan <br /> Mie remaining <br /> soil may e <br /> cubic yard will remain after backfilling the former tank cavity. <br /> moved from the site. The remaining soil be <br /> aerated if appropriate, before the soil is re Class III or Class 11 faciiitv- -nle <br /> disposal of at an appropriate disposal facili1v such as a <br /> disposal of the soil is ARCO's responsibility. <br /> Installation of Conductor -Cising___ <br /> 'k maximum of six conductor casings, two between each new tank,will be installed bfe rom the <br /> base of the new tank cavity to the ground surface. The conductor casing will driven <br /> 9 <br /> 3MB-3W <br /> 1150-1 Kim WIMM <br />
The URL can be used to link to this page
Your browser does not support the video tag.