My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012744
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
3500 - Local Oversight Program
>
PR0545339
>
ARCHIVED REPORTS_XR0012744
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:22:06 PM
Creation date
2/11/2020 4:43:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012744
RECORD_ID
PR0545339
PE
3528
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
02
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 16, 1991 <br /> ARCO Service Station No. 2076, Lodi. California clean pea gravel 6ackfilf. <br /> ded <br /> approximately 2 feet into native soil and then suI be use by, <br /> Twelve-inch-diameter polyvinyl chloride pipe will be used for conductor casing- The <br /> conductor casing will allow soil borings to be drifted betweenec inue <br /> ssarv. tanks psoroextratction <br /> further investigation of soil conditions beneath the tanks if n <br /> be installed in these borings if remediation of soil is warranted. If residual <br /> wells could appropriate <br /> hydrocarbons are present in coif in the former or new product-line trenches, a prop <br /> subgrade piping will be installed for use in a vapor-extraction system. <br /> s� <br /> I.00RATORY ANALYSES <br /> les collected from the bottom of the existing and proposed tank cavities and <br /> Soi. samped les for analysis of TPH9 <br /> product line trenches will be submitted to modified EPA'Method 8015 and BTEY by EPA <br /> by EPA preparation Method 5030 and mtank will be <br /> i4lethod 8020. Soil Samples collected from under the former leadb0 Laboratory <br /> results will be <br /> submitted for analysis of total lead and dibromethane (ED a1 forwarded to the SJCPHS <br /> discussed with ARCO personnel and with ARCO's app <br /> rization to Release Analytical Data farm is included in <br /> E <br /> Hl], A copy of a signed Autho <br /> t.ppenciix F of this work plan. <br /> OBTAINING APPROVAL FOR TANK INSTALLATION <br /> showing sample Vocations will be <br /> With ARCO's app <br /> sa roval, laboratory results and a map g <br /> provided to the SJCPHS-EHD to expedite (1) the installation of the new underground <br /> and product Vines,(2)the backfilling of the former tank cavity with stockpiled <br /> storage tanks P <br /> y soil, and (3) the installation of piping for a VES. The layout of the VES will be base an <br /> results of our July 1991 VET. "Mese tasks will be conducted after the SJCPHS-EID <br /> receives the laboratory reports and approves the work. <br /> `_. 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.